Risk: Medium Substation Operational

W. A. Parish Station (345 kV) - High-Voltage Substation in Texas, United States

United States

Overview

W. A. Parish Station (345 kV) is a high-voltage substation in Texas, United States, operated by CenterPoint Energy. It plays a critical role in the regional electrical grid.

W. A. Parish Station (345 kV) is a high-voltage electrical substation located in Texas, United States. Operated by CenterPoint Energy, this facility operates at 345 kV, placing it in the large-scale transmission category critical for long-distance power delivery and grid stability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), ensuring compliance with reliability standards for bulk power systems. As a 345 kV facility, it is a key node in the transmission network, interconnecting generation sources with load centers. This substation supports the electrical infrastructure of the Houston metropolitan area and surrounding regions, facilitating reliable power distribution. Its operational status and high voltage level underscore its importance in maintaining grid resilience and meeting the energy demands of a growing population.

Environmental context

Located in a suburban area near Houston, Texas, the substation's environmental context includes proximity to urban development and industrial activity. High-voltage substations like this one are typically designed with minimal environmental footprint, though they require careful land use planning and adherence to electromagnetic field guidelines. The facility's operation supports the integration of renewable energy sources into the grid, contributing to regional sustainability goals.

Frequently asked questions

W. A. Parish Station (345 kV) is located in Texas, United States, near the Houston metropolitan area.

W. A. Parish Station operates at 345 kV, which is a high-voltage transmission level used for bulk power transfer across long distances.

The substation is operated by CenterPoint Energy, a major utility company serving the Texas region.

As part of the US bulk power system, this substation must comply with NERC reliability standards and FERC regulations to ensure grid stability and security.

A 345 kV substation is a critical component of the transmission network, enabling efficient power transfer from generation plants to distribution systems and supporting grid reliability.
UtilityRadar
More
Press Esc to close · Browse by sector