Overview
Waltham Road Substation is an operational electrical substation in Maine, United States, operated by Versant Power. It operates at 115 kV, serving the local grid.
Waltham Road Substation is an operational electrical substation located in Maine, United States. It is owned and operated by Versant Power, a major utility in the region. The substation operates at a voltage of 115 kV, classifying it as a medium-voltage facility within the transmission and distribution network. As a substation in the United States, it operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system. The facility likely includes switchgear and transformers typical of a distribution substation, stepping down voltage for local distribution. The substation plays a critical role in maintaining grid stability and reliability for the surrounding area. Its location in Maine, a state with significant renewable energy resources, may also support integration of wind and hydroelectric power into the grid. The facility contributes to the resilience of the regional electrical infrastructure.
Environmental context
The substation is located in a rural area of Maine, where the surrounding landscape includes forests and water bodies. Electrical infrastructure in such settings must consider wildlife corridors and vegetation management to prevent outages. The 115 kV voltage level indicates moderate environmental footprint, with typical mitigation measures including oil containment for transformers and noise reduction.
Frequently asked questions
Waltham Road Substation is located in Maine, United States, near coordinates 44.580385, -68.433685.
Waltham Road Substation is owned and operated by Versant Power, a utility serving northern and eastern Maine.
Waltham Road Substation operates at 115 kV, which is a common voltage for subtransmission and distribution substations.
As part of the U.S. bulk power system, Waltham Road Substation must comply with NERC reliability standards and FERC regulations.
A 115 kV substation typically steps down transmission voltage for local distribution, ensuring reliable electricity supply to residential, commercial, and industrial customers.