Substation Operational

Warner Road Sub - NIPSCO Substation in the United States

United States

Overview

Warner Road Sub is an operational substation in the United States, owned and operated by NIPSCO. It operates at 69 kV, serving the local electrical grid.

Warner Road Sub is a substation located in the United States, owned and operated by NIPSCO. The facility is operational and plays a role in the regional electrical infrastructure, stepping down transmission voltages for distribution. The substation operates at a voltage of 69 kV, which is typical for sub-transmission or distribution-level facilities. As part of the NIPSCO network, it is subject to NERC reliability standards and FERC regulation, ensuring grid stability and compliance with US electrical codes. This substation contributes to the reliability of the local power supply, supporting residential and commercial customers in the area. Its location in the Midwest places it within a region with diverse energy sources, including natural gas and renewables, and it helps integrate these into the grid.

Environmental context

The substation's 69 kV voltage level indicates it is a medium-voltage facility, typically located in suburban or rural areas. Its operation involves minimal direct environmental impact, but it supports the grid's ability to transmit power from generation sources to load centers. The surrounding area in northern Indiana includes agricultural and residential land, and the substation's role in voltage regulation helps maintain power quality for local communities.

Frequently asked questions

Warner Road Sub is located in the United States, with coordinates approximately 41.423180 N, -85.710861 W. It is operated by NIPSCO.

Warner Road Sub operates at 69 kV, which is a common voltage for sub-transmission and distribution substations.

Warner Road Sub is owned and operated by NIPSCO, a utility company serving parts of Indiana.

US substations are regulated by NERC reliability standards and FERC for transmission-level assets. Facilities like Warner Road Sub must comply with these standards to ensure grid stability.

A 69 kV substation typically steps down transmission voltages to distribution levels, serving local communities and industries. It helps maintain voltage stability and reliability in the regional grid.
UtilityRadar
More
Press Esc to close · Browse by sector