Substation Operational

Washington Substation #2 Stepup - Georgia Power Substation in Washington, Georgia

United States

Overview

Washington Substation #2 Stepup is an operational substation in the United States, owned and operated by Georgia Power. It handles voltages of 115 kV and 46 kV, serving the electrical grid in the Washington, Georgia area.

Washington Substation #2 Stepup is a substation located in the United States, specifically in the vicinity of Washington, Georgia. Owned and operated by Georgia Power, a major utility in the southeastern US, this facility plays a key role in the regional electrical infrastructure. The substation operates at voltage levels of 115 kV and 46 kV, indicating its function in stepping up or stepping down power for transmission and distribution. As part of the US electrical grid, this substation operates under the regulatory framework established by the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for transmission-level assets, ensuring grid stability and security. The substation's voltage levels suggest it connects transmission and distribution networks, typical for facilities serving both industrial and residential customers in rural and suburban areas. The environmental context of this substation includes its location in a region with a mix of agricultural and forested land, typical of eastern Georgia. Substations like this one are critical for maintaining grid reliability, especially in areas prone to severe weather such as thunderstorms and hurricanes. The facility's operational status and integration with Georgia Power's network contribute to the resilience of the local power supply, supporting community services and economic activities.

Environmental context

Located in a region with a humid subtropical climate, this substation faces environmental challenges such as thunderstorms, lightning strikes, and occasional hurricanes. The surrounding area includes agricultural and forested land, requiring careful management of vegetation to prevent outages. The substation's voltage levels and urban-rural interface influence its role in grid stability and reliability.

Frequently asked questions

Washington Substation #2 Stepup is located near Washington, Georgia, United States, at coordinates 33.705587, -82.753573.

The substation operates at voltage levels of 115 kV and 46 kV, typical for transmission and distribution connections.

The substation is owned and operated by Georgia Power, a subsidiary of Southern Company, serving customers in Georgia.

As part of the US electrical grid, this substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.

Substations step up or step down voltage for efficient transmission and distribution, ensuring reliable power delivery to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector