Substation Operational

Wauseon Substation - Toledo Edison Electrical Substation in Wauseon, Ohio

United States

Overview

Wauseon Substation is an operational electrical substation in Wauseon, Ohio, operated by Toledo Edison. It handles voltages of 138 kV and 69 kV, serving the local grid.

Wauseon Substation is an operational electrical substation located in Wauseon, Ohio, United States. Owned and operated by Toledo Edison, a subsidiary of FirstEnergy, the facility plays a key role in the regional power distribution network. The substation handles primary voltages of 138 kV and 69 kV, indicating its function as a transmission-to-distribution interface. Operating under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), the substation adheres to mandatory reliability standards. As part of the PJM Interconnection grid, it contributes to the stability of the Mid-Atlantic and Great Lakes power systems. The 138 kV voltage level classifies it as a medium-to-high voltage substation, typical for serving industrial and urban loads. The substation's location in Fulton County supports the electrical infrastructure of Wauseon and surrounding communities. Its operational status ensures continued power delivery to residential, commercial, and agricultural customers. It remains an integral component of the local grid.

Environmental context

The substation is situated in a rural agricultural area of northwestern Ohio, where the landscape is dominated by farmland and small towns. Electrical infrastructure in such regions must balance reliability with environmental considerations, such as minimizing land use and avoiding sensitive habitats. The substation's voltage levels suggest it serves as a critical node for distributing power to local communities and farms.

Frequently asked questions

Wauseon Substation is located in Wauseon, Ohio, United States, at coordinates 41.5464 N, 84.1526 W.

Wauseon Substation is owned and operated by Toledo Edison, a subsidiary of FirstEnergy Corporation.

Wauseon Substation operates at 138 kV and 69 kV, serving as a transmission-to-distribution substation.

As part of the US grid, Wauseon Substation must comply with NERC reliability standards and FERC regulations, and it operates within the PJM Interconnection.

Substations like Wauseon step down high transmission voltages to lower distribution voltages, ensuring safe and reliable electricity delivery to homes and businesses.
UtilityRadar
More
Press Esc to close · Browse by sector