Overview
Waynedale Substation is an operational electrical substation in the United States, operating at 138 kV. It plays a key role in regional grid stability and power distribution.
Waynedale Substation is an operational electrical substation located in the United States, with coordinates 41.025050, -85.179954. Operating at a voltage of 138 kV, it is classified as a high-voltage substation, typical of transmission-level infrastructure that supports bulk power transfer and grid reliability. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which enforce reliability standards for the bulk power system. As a 138 kV facility, it likely serves as a key node in the regional transmission network, stepping down power for distribution or interconnecting generation sources. Waynedale Substation contributes to the electrical infrastructure of its region by ensuring stable voltage levels and facilitating the efficient flow of electricity. Its operational status indicates ongoing maintenance and compliance with industry standards, supporting local communities and industrial users with reliable power supply.
Environmental context
The substation's location in the United States places it within a grid system subject to NERC reliability standards. At 138 kV, it is a high-voltage facility that may be situated in a mixed urban-rural area, influencing local land use and requiring careful siting to minimize electromagnetic field impacts. The surrounding environment likely includes residential or agricultural zones, where substation operations are managed to reduce noise and visual intrusion.
Frequently asked questions
Waynedale Substation is located in the United States at coordinates 41.025050, -85.179954.
Waynedale Substation operates at 138 kV, which is a high-voltage level typical for transmission substations.
Waynedale Substation is currently operational, meaning it is actively used in the electrical grid.
US substations are regulated by NERC reliability standards and FERC oversight, ensuring grid stability and compliance.
A 138 kV substation typically steps down transmission voltage for distribution or interconnects generation, supporting regional power flow.