Overview
Weiler Substation is an operational electrical substation in Tempe, Arizona, operated by Salt River Project. It operates at 69 kV, serving the local grid.
Weiler Substation is an operational electrical substation located in Tempe, Arizona, United States. It is owned and operated by Salt River Project, a major utility in the region. The substation operates at a voltage of 69 kV, classifying it as a medium-voltage facility within the electrical infrastructure network. The substation operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC), which set reliability standards for the bulk power system. As part of the Salt River Project system, it contributes to the stability and reliability of the local grid, serving residential, commercial, and industrial customers in the Phoenix metropolitan area. Weiler Substation plays a key role in distributing electricity from transmission lines to local distribution networks. Its location in an urban area underscores its importance in meeting the energy demands of a growing population. The facility's operational status ensures continued support for the region's electrical infrastructure and economic activity.
Environmental context
The substation is located in an urban setting in Tempe, Arizona, a region characterized by a hot desert climate. The surrounding area includes residential and commercial developments, as well as proximity to the Salt River. Electrical infrastructure in such environments must manage heat dissipation and ensure reliability during peak summer demand. The substation's design likely incorporates measures to mitigate environmental impact, such as noise reduction and stormwater management.
Frequently asked questions
Weiler Substation is located in Tempe, Arizona, United States, at coordinates 33.416331, -111.970660.
Weiler Substation is owned and operated by Salt River Project, a major utility serving the Phoenix metropolitan area.
Weiler Substation operates at 69 kV (69,000 volts), which is a medium voltage level for electrical substations.
As part of the US electrical grid, Weiler Substation must comply with NERC reliability standards and FERC regulations for transmission-level assets.
A 69 kV substation typically steps down transmission voltage to distribution levels, serving local residential, commercial, and industrial customers.