Risk: Medium Substation Operational

West Plano Substation: 345/138 kV Electrical Substation in Texas, United States

United States

Overview

West Plano Substation is an operational electrical substation in the United States, handling voltages of 345 kV and 138 kV. It plays a key role in the regional transmission grid.

West Plano Substation is an operational electrical substation located in the United States, specifically in the Plano area of Texas. It operates at high voltage levels of 345 kV and 138 kV, indicating its role in both transmission and sub-transmission networks. The substation is part of the broader electrical infrastructure that supports the growing demand in the Dallas-Fort Worth metroplex. The substation's voltage levels suggest it is a critical node in the grid, likely connecting long-distance transmission lines to local distribution networks. In the United States, such facilities operate under NERC reliability standards and FERC regulation, ensuring grid stability and compliance with mandatory reliability requirements. The 345 kV level is typical for bulk power transmission, while 138 kV is common for sub-transmission, making this substation a key interface between high-voltage and medium-voltage systems. As part of the Texas Interconnection, which operates independently from the Eastern and Western Interconnections, West Plano Substation contributes to the reliability of the ERCOT grid. Its location in a rapidly urbanizing area underscores its importance in supporting residential, commercial, and industrial electricity needs. The substation's operational status ensures continued service to the community and the broader regional economy.

Environmental context

The substation is situated in an urbanized area of Plano, Texas, within the Dallas-Fort Worth metropolitan region. The local environment is characterized by mixed residential and commercial development, with significant electricity demand for cooling during hot summers. The substation's high voltage levels indicate its role in efficiently transmitting power over distances, reducing line losses and supporting grid stability. Its location in a built-up area means it is subject to urban heat island effects and must comply with local noise and safety regulations.

Frequently asked questions

West Plano Substation is located in the United States, specifically in the Plano area of Texas, near coordinates 33.012673, -96.777443.

West Plano Substation operates at 345 kV and 138 kV, indicating its role in both high-voltage transmission and sub-transmission.

West Plano Substation is currently operational, serving as an active node in the electrical grid.

As a US substation, West Plano Substation operates under NERC reliability standards and FERC regulation, ensuring grid stability and compliance.

345 kV is a common voltage for bulk power transmission over long distances, while 138 kV is used for sub-transmission to distribute power to local networks. Together, they enable efficient power delivery from generation sources to end users.