Overview
Whiting Ave is an operational electrical substation in the United States, handling voltages of 115 kV and 43.8 kV. It plays a key role in local grid stability and power distribution.
Whiting Ave is an operational electrical substation located in the United States, with coordinates 44.496215, -89.572098. As a substation, it serves as a critical node in the electrical grid, stepping down transmission voltages for distribution to end users. The facility operates under the regulatory oversight of NERC and FERC, ensuring compliance with reliability standards for bulk power systems. The substation is equipped to handle two voltage levels: 115 kV and 43.8 kV, indicating its role in both sub-transmission and primary distribution. This dual-voltage capability allows it to interconnect with higher-voltage transmission lines and supply lower-voltage distribution networks. The facility's operational status and voltage specifications suggest it is a medium-scale substation typical of rural or suburban areas in the United States. Whiting Ave contributes to the reliability of the local electrical infrastructure by providing voltage transformation and switching capabilities. Its location in central Wisconsin supports the regional grid, serving residential, commercial, and industrial customers. The substation's design and operation align with ISO/IEC 61850 standards for substation automation, enhancing grid resilience and monitoring.
Environmental context
The substation is situated in a rural area of Wisconsin, where the surrounding environment includes agricultural land and scattered woodlands. Its operation involves electromagnetic fields and potential impacts on local wildlife, though modern substations are designed to minimize ecological disruption. The facility's voltage levels and location away from dense urban centers reduce the risk of exposure to sensitive populations, while its role in grid stability supports the integration of renewable energy sources in the region.
Frequently asked questions
Whiting Ave substation is located in the United States at coordinates 44.496215, -89.572098, likely in central Wisconsin.
Whiting Ave substation handles two voltage levels: 115 kV for sub-transmission and 43.8 kV for primary distribution.
Whiting Ave substation is currently operational, meaning it is actively transforming and switching electrical power.
As a US substation, Whiting Ave must comply with NERC reliability standards and FERC regulations for bulk power system operation.
Substations like Whiting Ave step down transmission voltages to distribution levels, isolate faults, and route power to ensure grid stability and reliable electricity supply.