Overview
Woodward Wind 1 Substation is an operational 138 kV substation in Texas, United States, owned and operated by NextEra Energy. It supports wind energy transmission from the Woodward Wind facility.
Woodward Wind 1 Substation is a high-voltage electrical substation located in Texas, United States, near the coordinates 30.951576, -102.480993. Owned and operated by NextEra Energy, the facility is part of the infrastructure supporting the Woodward Wind energy project, a major renewable energy installation in the region. The substation operates at 138 kV, a standard voltage level for regional power collection and transmission. As a substation in the United States, Woodward Wind 1 operates under the regulatory framework of the North American Electric Reliability Corporation (NERC) and the Federal Energy Regulatory Commission (FERC). These bodies enforce reliability standards for the bulk power system, ensuring grid stability and security. The 138 kV voltage level classifies this facility as a sub-transmission or distribution substation, typically connecting wind farms to the larger transmission grid. The substation plays a critical role in integrating renewable energy into the Texas power grid, which is managed by the Electric Reliability Council of Texas (ERCOT). By stepping up voltage from wind turbines for long-distance transmission, it enables the delivery of clean electricity to load centers. The facility's location in a rural, wind-rich area underscores its importance in supporting the region's growing renewable energy capacity.
Environmental context
The substation is situated in a semi-arid region of West Texas, characterized by low population density and significant wind resources. The area supports large-scale wind energy development, which reduces greenhouse gas emissions compared to fossil fuel generation. The substation's operation involves minimal direct environmental impact, though its construction and maintenance require land use and potential wildlife considerations. The facility contributes to the local economy by enabling renewable energy production and grid reliability.
Frequently asked questions
Woodward Wind 1 Substation is located in Texas, United States, near coordinates 30.951576, -102.480993. It serves the Woodward Wind energy project in the region.
Woodward Wind 1 Substation operates at 138 kV, a standard voltage for sub-transmission and distribution substations connecting wind farms to the grid.
The substation is owned and operated by NextEra Energy, a leading renewable energy company in the United States.
Substations in the US must comply with NERC reliability standards and FERC regulations for grid stability. For wind integration, additional requirements from the Electric Reliability Council of Texas (ERCOT) may apply.
The substation collects power from the Woodward Wind farm and steps up voltage for transmission, enabling clean electricity to reach consumers and supporting Texas's renewable energy goals.