Risk: Low Substation Operational

Wormser Road Substation - 138 kV Electrical Substation in Texas, United States

United States

Overview

Wormser Road Substation is an operational electrical substation in Texas, United States, operated by American Electric Power. It operates at 138 kV, serving as a key node in the regional transmission grid.

Wormser Road Substation is an operational electrical substation located in Texas, United States, and operated by American Electric Power. The facility operates at a voltage of 138 kV, placing it within the high-voltage transmission category typical for regional power distribution and grid interconnection. As part of the American Electric Power network, this substation adheres to North American Electric Reliability Corporation (NERC) reliability standards and Federal Energy Regulatory Commission (FERC) regulations for transmission-level assets. The 138 kV voltage level is common for sub-transmission and distribution substations that serve industrial and urban loads, often incorporating modern switchgear and automation systems compliant with ISO/IEC 61850 standards. The substation plays a critical role in maintaining grid stability and reliability for the surrounding area. Its location in Texas, a state with a large and diverse energy mix including wind, solar, and natural gas, underscores its importance in integrating renewable energy sources and ensuring consistent power delivery to end users.

Environmental context

The substation is situated in a region characterized by semi-arid climate and sparse vegetation, typical of southern Texas. The facility's design and operation consider local environmental factors such as heat and dust, which can affect equipment performance. As part of the electrical grid, it supports the integration of renewable energy sources like wind and solar, contributing to reduced greenhouse gas emissions compared to fossil fuel generation.

Frequently asked questions

Wormser Road Substation is located in Texas, United States, near coordinates 27.454321, -99.417588.

Wormser Road Substation operates at 138 kV, which is a common voltage for sub-transmission and distribution substations.

Wormser Road Substation is operated by American Electric Power, one of the largest electric utilities in the United States.

As part of the US electrical grid, Wormser Road Substation must comply with NERC reliability standards and FERC regulations for transmission assets.

A 138 kV substation typically steps down transmission voltage for distribution to industrial and residential areas, ensuring stable and reliable power delivery.
UtilityRadar
More
Press Esc to close · Browse by sector