Overview
The 328 Replacement Project (Amending Gin City to Bradley) is an operational gas distribution station in Bradley, Arkansas, United States. It serves the local natural gas infrastructure under US PHMSA pipeline safety regulations.
The 328 Replacement Project (Amending Gin City to Bradley) is a gas distribution station located at AR-160 and CR 50 in Bradley, Lafayette County, Arkansas. This facility is part of the United States' extensive natural gas distribution network, which delivers gas to residential, commercial, and industrial customers. The station is operational and plays a role in maintaining reliable gas supply in the region. As a gas distribution station, this facility operates under the regulatory framework of the US Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with DOT 49 CFR Part 192, which governs pipeline safety. The station likely includes metering, pressure regulation, and odorization equipment to ensure safe and efficient gas delivery. In Arkansas, gas distribution infrastructure is typical for rural and suburban areas, supporting local communities. The facility's location in rural Arkansas places it in a region with low population density, reducing certain risk factors associated with proximity to populated areas. However, the area is subject to seismic activity from the New Madrid Seismic Zone, which may influence operational safety measures. The station's role in the local gas grid contributes to energy access for the surrounding community.
Environmental context
The facility is situated in a rural area of Lafayette County, Arkansas, characterized by agricultural land and low population density. This setting reduces the risk of exposure to populated areas, but the region is within the influence of the New Madrid Seismic Zone, which poses a moderate seismic hazard. Gas distribution stations in such areas must incorporate seismic resilience measures to maintain integrity during earthquakes. Additionally, the local climate includes hot summers and occasional severe weather, which may affect infrastructure maintenance.
Frequently asked questions
The 328 Replacement Project gas distribution station is located at AR-160 and CR 50 in Bradley, Lafayette County, Arkansas, United States.
This facility is a gas distribution station that receives natural gas from transmission pipelines and reduces pressure for safe delivery to local homes, businesses, and industries. It includes equipment for metering, pressure regulation, and odorization.
Gas distribution stations in the United States are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under DOT 49 CFR Part 192, which covers pipeline safety, design, construction, operation, and maintenance.
Gas distribution stations vary in capacity, typically ranging from small units serving a few hundred customers to large stations handling several million cubic feet per day. The capacity depends on the size of the service area and demand.
The station's rural location in Arkansas reduces risks from high population density but requires consideration of seismic hazards from the New Madrid Seismic Zone. Operators must follow PHMSA regulations for seismic design and emergency response.
Other Gas Distribution Station plants in United States · 6 nearby