Overview
Noble Tank Battery #11647000 is an operational gas extraction facility located near Eaton, Colorado. It operates under US PHMSA and DOT 49 CFR Part 192 regulations.
Noble Tank Battery #11647000 is a gas extraction facility located approximately 2.2 miles east of Eaton, Colorado, in Weld County. The facility is operational and serves as part of the regional natural gas infrastructure in the Denver-Julesburg Basin, a major oil and gas producing area. The facility operates under the regulatory framework of the US Pipeline and Hazardous Materials Safety Administration (PHMSA) and DOT 49 CFR Part 192, which governs the safe transportation of natural gas. As a tank battery, it likely includes separators, storage tanks, and associated piping for processing and storing extracted gas and liquids. The NAICS codes 211112 (Natural Gas Liquid Extraction) and 211130 (Natural Gas Extraction) indicate its role in both gas extraction and natural gas liquid recovery. Located in a region with active oil and gas development, the facility contributes to the local energy supply chain. Its proximity to agricultural areas and small communities underscores the importance of adherence to safety and environmental regulations to minimize risks associated with gas extraction operations.
Environmental context
The facility is situated in Weld County, Colorado, an area with a mix of agricultural land and oil and gas operations. The region experiences semi-arid climate conditions with potential for drought and wildfire risks. Proximity to populated areas and agricultural zones necessitates careful management of emissions, groundwater protection, and spill prevention to mitigate environmental impacts.
Frequently asked questions
Noble Tank Battery #11647000 is located approximately 2.2 miles east of Eaton, Colorado, in Weld County, United States.
It is a gas extraction facility that processes natural gas and natural gas liquids from wells in the Denver-Julesburg Basin.
The facility operates under US PHMSA pipeline safety regulations and DOT 49 CFR Part 192, which set standards for design, construction, and operation of gas infrastructure.
Gas extraction facilities in Colorado range from small wellhead sites to large centralized processing plants. Tank batteries like this one are common for gathering and initial processing.
The facility must comply with state and federal environmental regulations, including air quality permits, spill prevention plans, and groundwater monitoring to minimize impacts on surrounding areas.
Other Gas Extraction plants in United States · 6 nearby