Overview
US Steel Mon Valley Works - Clairton Plant is a primary metal facility in Clairton, Pennsylvania, operating under US EPA regulations. It is a key part of the Mon Valley Works complex, involved in steelmaking and related processes.
US Steel Mon Valley Works - Clairton Plant is a primary metal facility located at 400 State St, Clairton, Pennsylvania, in Allegheny County. The plant is operational and is part of the larger Mon Valley Works complex, which is a significant industrial site in the region. The facility's NAICS codes (324110, 324199, 331110, 331111) indicate involvement in petroleum refining, other petroleum and coal products, and iron and steel mills, including basic steel production. The plant operates under the regulatory framework of the US Environmental Protection Agency (EPA), which enforces multi-media regulations including the Clean Air Act (CAA), Clean Water Act (CWA), Resource Conservation and Recovery Act (RCRA), and Toxics Release Inventory (TRI) Section 313 reporting. As a primary metal facility, it is subject to stringent emission standards and permitting requirements, particularly for air pollutants and wastewater discharges. The scale of operations is typical for large integrated steel mills in the United States, with significant production capacity. The environmental significance of the Clairton Plant lies in its role within the steel supply chain and its potential impact on local air and water quality. The facility is situated in an industrial area near the Monongahela River, which receives treated wastewater. Community proximity is a key consideration, as the plant is located near residential areas in Clairton. The plant's operations contribute to the regional economy but also require careful environmental management to mitigate pollution risks.
Environmental context
The Clairton Plant is located in the Monongahela River Valley, an area with a history of heavy industry. The local environmental context includes potential air emissions from coke ovens and steelmaking processes, as well as water discharges to the Monongahela River. The facility's proximity to residential communities necessitates robust pollution control measures. Regulatory oversight by the US EPA and Pennsylvania Department of Environmental Protection ensures compliance with air and water quality standards, but the inherent pollution intensity of primary metal production poses ongoing environmental challenges.
Frequently asked questions
The plant is located at 400 State St, Clairton, Pennsylvania 15025, in Allegheny County, United States.
The facility is a primary metal plant involved in iron and steel mills, as well as petroleum refining and coal products, as indicated by its NAICS codes.
The plant operates under US EPA regulations including the Clean Air Act, Clean Water Act, RCRA, and TRI reporting requirements, with oversight from the Pennsylvania Department of Environmental Protection.
Primary metal facilities like the Clairton Plant can emit air pollutants such as particulate matter and sulfur dioxide, and generate wastewater containing heavy metals. Proper treatment and emission controls are essential to minimize environmental impact.
As a primary metal facility, the plant likely treats its wastewater on-site before discharge, in compliance with the Clean Water Act and its National Pollutant Discharge Elimination System (NPDES) permit.
Other Primary Metal plants in United States · 6 nearby