Risk: Medium Harbour Operational

LEHIGH SOUTHWEST CEMENT Harbour Facility in Stockton, California

STOCKTON, California, United States

Overview

LEHIGH SOUTHWEST CEMENT is a harbour facility in Stockton, California, United States. It handles cement and related materials, serving the regional construction industry.

LEHIGH SOUTHWEST CEMENT is a harbour facility located at PORT ROAD 2 in Stockton, California, within San Joaquin County. The facility is operational and serves as a key marine terminal for the import and distribution of cement and other bulk construction materials in the region. As a harbour facility in the United States, it operates under federal and state environmental regulations, including the Clean Water Act and the National Pollutant Discharge Elimination System (NPDES) for stormwater management. The facility likely handles bulk cargo, requiring dust control and runoff management to minimize environmental impact. The facility plays a significant role in the local economy by supporting construction and infrastructure projects in the Central Valley. Its location on the San Joaquin River provides access to maritime shipping routes, connecting regional markets to global supply chains.

Environmental context

The facility is located on the San Joaquin River, which flows through the Sacramento-San Joaquin Delta, a critical estuarine ecosystem. Operations involve handling cement, a fine particulate material that requires careful dust management to prevent air and water pollution. Stormwater runoff from the site must be managed to prevent sediment and contaminants from entering the river, which supports diverse aquatic life and is a key water source for California.

Frequently asked questions

LEHIGH SOUTHWEST CEMENT is located at PORT ROAD 2 in Stockton, California, United States, within San Joaquin County.

As a cement terminal, the facility primarily handles bulk cement and related construction materials for import and distribution.

The facility is operational and serves as an active marine terminal for cement handling.

The facility must comply with the Clean Water Act, including NPDES permits for stormwater discharge, and local air quality regulations for dust control.

Typical management practices include dust suppression systems, stormwater runoff controls, and spill prevention measures to protect the San Joaquin River.

Other Harbour plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector