Overview
Validus Energy II Midcon LLC operates the Brogden 6 Pad oil extraction facility near Bridgeport, Oklahoma. This operational site contributes to the region's crude oil production under U.S. regulatory frameworks.
The Brogden 6 Pad is an oil extraction facility operated by Validus Energy II Midcon LLC, located approximately 0.5 miles west of Bridgeport, Oklahoma, off Old 66 Road. This site is part of the broader oil extraction sector in the United States, specifically within the Anadarko Basin, a prolific hydrocarbon-producing region. The facility is operational and supports the extraction of crude oil, contributing to the domestic energy supply. As an oil extraction site, the Brogden 6 Pad operates under U.S. Environmental Protection Agency (EPA) regulations, including the Clean Air Act (CAA) and the National Pollutant Discharge Elimination System (NPDES) for water discharges. The facility is classified under NAICS code 211120 (Crude Petroleum Extraction), which encompasses activities such as drilling, completing, and operating oil wells. Typical extraction methods in this region involve hydraulic fracturing and horizontal drilling, though specific techniques at this pad are not detailed. The facility's location in rural Oklahoma places it within a landscape of active oil and gas development. The environmental context includes potential impacts on local air quality from volatile organic compounds (VOCs) and methane emissions, as well as water usage and disposal considerations. The site's proximity to Bridgeport and transportation routes like Old 66 Road underscores its role in the regional oil supply chain, supporting downstream refining and distribution.
Environmental context
The Brogden 6 Pad is situated in the Anadarko Basin, a region with extensive oil and gas activity. Local environmental considerations include air emissions from extraction operations, such as VOCs and methane, which are regulated under EPA's New Source Performance Standards (NSPS) for the oil and gas sector. Water management is also critical, with produced water often disposed of via deep-well injection, subject to Underground Injection Control (UIC) program requirements. The facility's rural setting may reduce direct population exposure but requires careful monitoring of groundwater and surface water resources.
Frequently asked questions
The Brogden 6 Pad is located approximately 0.5 miles west of Bridgeport, Oklahoma, off Old 66 Road, in the United States.
The Brogden 6 Pad is an oil extraction facility that produces crude oil from wells in the Anadarko Basin, operated by Validus Energy II Midcon LLC.
The facility is operated by Validus Energy II Midcon LLC, a company involved in oil and gas extraction in Oklahoma.
Oil extraction in Oklahoma is regulated by the U.S. EPA under the Clean Air Act, Clean Water Act, and Safe Drinking Water Act, as well as state-level rules from the Oklahoma Corporation Commission.
Oil extraction pads in the Anadarko Basin vary in size but often include multiple wells per pad, with production ranging from tens to hundreds of barrels per day per well, depending on geological conditions.
Other Oil Extraction plants in United States · 6 nearby