Risk: Medium Gas Pipeline Operational

Centerline Atlantic Gas Pipeline, Staten Island, New York | United States Pipeline Infrastructure

STATEN ISLAND, New York, United States

Overview

Centerline Atlantic is an operational gas pipeline facility in Staten Island, New York, United States. It is classified under NAICS 486210 for pipeline transportation of natural gas.

Centerline Atlantic is a gas pipeline facility located at 4101 Arthur Kill Rd, Staten Island, New York, United States. The facility is operational and serves as part of the natural gas transportation infrastructure in the region. As a gas pipeline, it contributes to the distribution of natural gas across the state and potentially beyond. The facility operates under the regulatory oversight of the Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with 49 CFR Part 192, which governs gas pipeline safety. In New York, pipelines are also subject to state-level regulations to ensure safe operation. The NAICS code 486210 indicates that this facility is primarily engaged in pipeline transportation of natural gas. Centerline Atlantic plays a role in the energy supply chain, supporting residential, commercial, and industrial consumers in the New York metropolitan area. Its location near waterways and populated areas necessitates robust safety measures, including cathodic protection and regular inspections to mitigate risks associated with gas transport.

Environmental context

The facility is situated on Staten Island, near the Arthur Kill waterway, which connects to the New York Harbor. Proximity to waterways and densely populated areas requires stringent environmental safeguards to prevent leaks or ruptures. The pipeline's age and maintenance practices, including cathodic protection, are critical for minimizing corrosion-related risks. The commodity transported (natural gas) poses potential hazards such as methane emissions or explosion risks, necessitating compliance with PHMSA regulations and emergency response planning.

Frequently asked questions

Centerline Atlantic is located at 4101 Arthur Kill Rd, Staten Island, New York 10309, United States.

Centerline Atlantic is an operational gas pipeline facility that transports natural gas as part of the pipeline infrastructure in New York.

Centerline Atlantic is regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under 49 CFR Part 192 for gas pipeline safety, along with state-level regulations in New York.

Centerline Atlantic is classified under NAICS code 486210, which covers pipeline transportation of natural gas.

Safety measures include compliance with PHMSA regulations, cathodic protection to prevent corrosion, regular inspections, and emergency response planning to mitigate risks associated with natural gas transport.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector