Overview
CenterPoint Energy AEC #1 is a natural gas pipeline facility in Ozark, Arkansas, operating under US PHMSA and DOT 49 CFR Part 192 regulations. It serves the regional energy grid with midstream gas transmission infrastructure.
CenterPoint Energy AEC #1 is a natural gas pipeline facility located in Ozark, Franklin County, Arkansas, United States. The facility is operational and classified under NAICS 486210, which covers pipeline transportation of natural gas. As part of the CenterPoint Energy system, it plays a role in the midstream segment of the natural gas supply chain, connecting production areas to distribution networks. The facility operates under the regulatory oversight of the US Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with DOT 49 CFR Part 192, which governs the safe design, construction, and operation of gas pipelines. Typical infrastructure at such facilities includes compressor stations, metering equipment, and pipeline segments that require regular inspection and maintenance to ensure integrity and safety. In the context of Arkansas's energy landscape, CenterPoint Energy AEC #1 contributes to the reliable delivery of natural gas to residential, commercial, and industrial customers. The facility's location in a rural area near the Arkansas River corridor involves considerations for environmental stewardship, including erosion control and waterway protection. Its operational status supports the regional energy grid and local economic activity.
Environmental context
The facility is situated in a rural area of Franklin County, near the Arkansas River. Proximity to waterways necessitates careful management of erosion and spill prevention to protect aquatic habitats. The region's geology and climate influence pipeline integrity management, with cathodic protection systems used to mitigate corrosion risks. Regular monitoring and compliance with PHMSA regulations help minimize environmental impact.
Frequently asked questions
CenterPoint Energy AEC #1 is located at 1/4 mile south of Lowerland Road in Ozark, Franklin County, Arkansas, United States.
CenterPoint Energy AEC #1 is a natural gas pipeline facility, classified under NAICS 486210 for pipeline transportation of natural gas.
The facility is regulated by the US Pipeline and Hazardous Materials Safety Administration (PHMSA) under DOT 49 CFR Part 192, which sets safety standards for gas pipelines.
Gas pipelines in Arkansas typically employ cathodic protection to prevent corrosion, regular integrity inspections, and leak detection systems. Operators must comply with PHMSA's safety regulations and report any incidents.
CenterPoint Energy AEC #1 serves as a midstream natural gas transmission facility, helping to transport gas from production areas to local distribution networks that supply residential, commercial, and industrial customers in the region.
Other Gas Pipeline plants in United States · 6 nearby