Overview
Colorado Interstate Gas- Kit Carson C.S. is a gas pipeline facility located in Eads, Colorado, United States. It operates under US PHMSA and DOT 49 CFR Part 192 regulations.
Colorado Interstate Gas- Kit Carson C.S. is a gas pipeline facility situated at 3073 US Highway 287 in Eads, Kiowa County, Colorado. As part of the interstate natural gas pipeline network, it plays a role in transporting natural gas across the region. The facility is operational and classified under NAICS codes 211111, 211112, 211130, and 486210, indicating involvement in crude petroleum and natural gas extraction, natural gas liquid extraction, and natural gas pipeline transportation. The facility operates under the regulatory framework of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and DOT 49 CFR Part 192, which governs gas pipeline safety. Typical gas pipeline facilities in Colorado are subject to state and federal oversight, including requirements for cathodic protection, leak detection, and integrity management programs. The scale of this facility is consistent with regional interstate pipelines that serve local distribution networks and industrial customers. Environmentally, the facility is situated in a rural area of eastern Colorado, characterized by agricultural land and open plains. Pipelines in this region cross waterways and near populated areas, requiring careful monitoring and maintenance to prevent leaks or ruptures. The commodity transported (natural gas) poses risks of methane emissions and fire hazards, but modern pipeline safety practices mitigate these concerns. The facility contributes to the energy infrastructure of the region, supporting residential, commercial, and industrial natural gas supply.
Environmental context
The facility is located in a rural area of Kiowa County, Colorado, with low population density. The surrounding environment includes agricultural fields and grasslands, with potential proximity to waterways and irrigation canals. Natural gas pipelines in this region require robust cathodic protection and regular integrity assessments to prevent corrosion and leaks. The commodity transported is methane, a potent greenhouse gas, so leak detection and emission controls are critical environmental considerations.
Frequently asked questions
Colorado Interstate Gas- Kit Carson C.S. is located at 3073 US Highway 287 in Eads, Kiowa County, Colorado, United States.
It is a natural gas pipeline facility that transports natural gas as part of the interstate pipeline network, serving regional distribution and industrial customers.
Gas pipelines in Colorado are regulated by the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) under DOT 49 CFR Part 192, along with state-specific safety and environmental requirements.
Key risk factors include proximity to populated areas or waterways, age of the pipeline, effectiveness of cathodic protection, and the commodity transported (natural gas).
It supports the natural gas supply chain in eastern Colorado, helping deliver gas to residential, commercial, and industrial users in the region.
Other Gas Pipeline plants in United States · 6 nearby