Overview
DESOTO GATHERING CO, LLC-ALTOM CPF--1 is a gas pipeline facility in Drasco, Arkansas, United States. It operates under NAICS code 486210 for pipeline transportation of natural gas.
DESOTO GATHERING CO, LLC-ALTOM CPF--1 is a gas pipeline facility located at 27 Litaker Ridge Road in Drasco, Cleburne County, Arkansas, United States. The facility is operational and classified under NAICS code 486210, which covers pipeline transportation of natural gas. As a gathering pipeline, it likely collects natural gas from nearby production wells and transports it to larger transmission systems or processing plants. The facility operates under the regulatory oversight of the Pipeline and Hazardous Materials Safety Administration (PHMSA) and must comply with 49 CFR Part 192, which governs gas pipeline safety. This includes requirements for pipeline design, construction, testing, operation, and maintenance, as well as integrity management programs to prevent leaks and ruptures. The specific length of the pipeline and other technical details are not publicly available, but gathering pipelines in Arkansas typically range from a few miles to tens of miles in length. This pipeline plays a role in the natural gas supply chain in Arkansas, a state with significant natural gas production, particularly from the Fayetteville Shale. The facility contributes to the local economy by supporting energy extraction and transportation. Its location in a rural area near the Ozark Mountains means it must manage environmental considerations such as erosion control and protection of waterways.
Environmental context
The facility is situated in a rural area of Cleburne County, Arkansas, near the Ozark Mountains. The region features forested terrain and numerous streams that feed into the Little Red River. Pipeline operations in such areas require careful management to prevent soil erosion, protect water quality, and minimize disturbance to wildlife habitats. The commodity transported is natural gas, which poses risks of leaks or ruptures that could affect local ecosystems. Regulatory compliance under PHMSA includes requirements for leak detection and emergency response planning.
Frequently asked questions
The facility is located at 27 Litaker Ridge Road in Drasco, Cleburne County, Arkansas, United States.
It is a gas gathering pipeline facility that transports natural gas from production wells to larger transmission systems or processing plants.
Gas pipelines in the U.S. are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under 49 CFR Part 192, which sets safety standards for design, construction, operation, and maintenance.
NAICS code 486210 covers pipeline transportation of natural gas, including gathering, transmission, and distribution pipelines.
Gas gathering pipelines must comply with PHMSA regulations, including integrity management programs, leak detection, cathodic protection, and emergency response plans to prevent and mitigate leaks or ruptures.
Other Gas Pipeline plants in United States · 6 nearby