Overview
DESOTO GATHERING COMPANY LLC - CHARLEY CPF-3 is a gas pipeline facility in Heber Springs, Arkansas, United States. It operates under US PHMSA and DOT 49 CFR Part 192 regulations.
DESOTO GATHERING COMPANY LLC - CHARLEY CPF-3 is a gas pipeline facility located at 1800 Pangburn Rd, Heber Springs, Cleburne County, Arkansas, United States. The facility is operational and serves as part of the natural gas gathering infrastructure in the region. The facility operates under the regulatory framework of the US Pipeline and Hazardous Materials Safety Administration (PHMSA) and Department of Transportation (DOT) 49 CFR Part 192, which governs gas pipeline safety. The NAICS codes 213112 (Support Activities for Oil and Gas Operations) and 486210 (Pipeline Transportation of Natural Gas) classify its activities. As a gathering pipeline, it likely transports natural gas from production wells to processing or transmission systems. This facility contributes to the natural gas supply chain in Arkansas, supporting local energy needs and industrial activity. Its location in Cleburne County places it within a region with active oil and gas operations, and its operational status ensures continued service to the grid.
Environmental context
The facility is situated in a rural area near Heber Springs, which is close to the Little Red River and Greers Ferry Lake. Proximity to waterways requires careful management to prevent leaks or spills. Typical gas gathering systems in the region are subject to PHMSA corrosion control requirements. The commodity transported (natural gas) poses lower environmental risk than hazardous liquids but still requires leak detection and emergency response planning.
Frequently asked questions
The facility is located at 1800 Pangburn Rd, Heber Springs, Cleburne County, Arkansas, United States.
It is a gas pipeline facility, specifically a natural gas gathering system, operating under NAICS codes 213112 and 486210.
The facility is regulated by the US Pipeline and Hazardous Materials Safety Administration (PHMSA) under DOT 49 CFR Part 192 for gas pipeline safety.
Gas gathering pipelines must comply with PHMSA regulations including corrosion control, leak detection, and emergency response requirements under 49 CFR Part 192.
Proximity to the Little Red River and Greers Ferry Lake requires environmental safeguards to prevent natural gas leaks, which can impact water quality and ecosystems.
Other Gas Pipeline plants in United States · 6 nearby