Risk: Medium Gas Pipeline Operational

DESOTO GATHERING COMPANY, LLC - TIGER CPF-1 Gas Pipeline Facility in Bradford, Arkansas

BRADFORD, Arkansas, United States

Overview

DESOTO GATHERING COMPANY, LLC - TIGER CPF-1 is an operational gas pipeline facility in Bradford, Arkansas, United States. It supports natural gas gathering and transportation under PHMSA and DOT 49 CFR Part 192 regulations.

DESOTO GATHERING COMPANY, LLC - TIGER CPF-1 is a gas pipeline facility located at 199 Wallis Road in Bradford, White County, Arkansas, United States. The facility is operational and serves as a central processing point for natural gas gathering in the region. Its NAICS codes (213112 and 486210) indicate activities in support of oil and gas operations and natural gas pipeline transportation. The facility operates under the regulatory framework of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and DOT 49 CFR Part 192, which governs gas pipeline safety. As a gathering pipeline facility, it likely includes compression, metering, and dehydration equipment to process natural gas from nearby wells before delivery to larger transmission pipelines. The scale of such facilities in Arkansas varies, but they are integral to the state's natural gas production infrastructure. Environmentally, the facility's location in rural White County reduces immediate population density risks, but proximity to waterways and agricultural areas requires careful management of potential leaks or ruptures. The commodity transported (natural gas) poses flammability hazards, and pipeline age and cathodic protection are key factors in maintaining integrity. The facility contributes to the regional energy supply chain, supporting local gas production and downstream consumers.

Environmental context

The facility is situated in a rural area of White County, Arkansas, where the primary environmental considerations include proximity to agricultural land and local waterways. Natural gas pipelines carry flammable gas, and any release could pose fire or explosion risks to nearby communities or ecosystems. Regular inspections and cathodic protection systems are essential to prevent corrosion-related failures. The region's climate, with seasonal temperature variations, can affect pipeline integrity through soil movement or freeze-thaw cycles.

Frequently asked questions

The facility is located at 199 Wallis Road in Bradford, White County, Arkansas, United States.

It is a gas pipeline facility that gathers and processes natural gas from production wells, preparing it for transport into larger transmission pipelines.

The facility is regulated by the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) under DOT 49 CFR Part 192, which sets safety standards for gas pipelines.

The facility operates under NAICS codes 213112 (Support Activities for Oil and Gas Operations) and 486210 (Pipeline Transportation of Natural Gas).

It supports local natural gas production and provides energy infrastructure, but requires careful safety management due to the flammable nature of natural gas and its rural location near agricultural areas.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector