Risk: Medium Gas Pipeline Operational

DESOTO - STEELHEAD 1 Gas Pipeline, Clinton, Arkansas | United States Pipeline Infrastructure

CLINTON, Arkansas, United States

Overview

DESOTO - STEELHEAD 1 is a gas pipeline facility in Clinton, Arkansas, United States. It operates under PHMSA and DOT 49 CFR Part 192 regulations.

DESOTO - STEELHEAD 1 is a gas pipeline facility located at 608 Hard Way Road in Clinton, Van Buren County, Arkansas, United States. The facility is operational and serves as part of the natural gas transmission infrastructure in the region. The facility operates under the regulatory framework of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Department of Transportation (DOT) 49 CFR Part 192, which governs gas pipeline safety. As a gas pipeline, it is subject to standards for design, construction, testing, and maintenance to ensure safe operation. This pipeline contributes to the natural gas supply network in Arkansas, supporting residential, commercial, and industrial energy needs. Its location in a rural area of Van Buren County may reduce population density risks, but proximity to waterways or other sensitive areas would require appropriate safety measures.

Environmental context

The pipeline traverses the Arkansas Ozarks region, characterized by forested hills and numerous waterways. Proximity to populated areas and water crossings can increase environmental risk. The commodity transported (natural gas) poses potential hazards such as leaks or ruptures, which could affect local ecosystems. Cathodic protection systems are typically employed to prevent corrosion, a key factor in pipeline integrity.

Frequently asked questions

DESOTO - STEELHEAD 1 is located at 608 Hard Way Road, Clinton, Van Buren County, Arkansas, United States.

DESOTO - STEELHEAD 1 is a natural gas pipeline facility, classified under NAICS codes 213112 (Support Activities for Oil and Gas Operations) and 486210 (Pipeline Transportation of Natural Gas).

Gas pipelines in the United States are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under the Department of Transportation (DOT), specifically 49 CFR Part 192 for gas pipelines.

Gas pipelines must comply with PHMSA regulations including design standards, corrosion control (cathodic protection), leak detection, emergency response plans, and regular inspections.

DESOTO - STEELHEAD 1 is currently operational, contributing to the natural gas transmission network in Arkansas.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector