Gas Pipeline Operational

Enbridge Yazo Kosc Line 26 HDD Replacement Project - Gas Pipeline in Pickens, Mississippi

PICKENS, Mississippi, United States

Overview

Enbridge Yazo Kosc Line 26 HDD Replacement Project is an operational gas pipeline in Pickens, Mississippi, United States. This facility is part of Enbridge's pipeline infrastructure, serving the region's natural gas transportation needs.

The Enbridge Yazo Kosc Line 26 HDD Replacement Project is a gas pipeline facility located in Pickens, Holmes County, Mississippi, United States. This operational pipeline is part of Enbridge's extensive network, contributing to the transportation of natural gas across the region. The facility is situated on Slack Road, with coordinates 32.929111, -90.086917, and operates under the NAICS code 486210 for pipeline transportation of natural gas. As a gas pipeline, this facility is subject to the regulatory oversight of the Pipeline and Hazardous Materials Safety Administration (PHMSA) under the U.S. Department of Transportation, specifically 49 CFR Part 192 for gas pipelines. The project involves horizontal directional drilling (HDD) techniques, which are used to install pipelines with minimal environmental disruption. In the United States, gas pipelines are critical infrastructure for energy distribution, and this facility plays a role in maintaining supply reliability in Mississippi. The environmental context of this pipeline includes its location in a rural area of Mississippi, near waterways and agricultural lands. The use of HDD technology reduces surface disturbance, but pipelines in this region must consider soil erosion and water quality protection. The facility's operational status indicates it is actively contributing to the local energy grid, supporting residential, commercial, and industrial consumers in the area.

Environmental context

The pipeline is located in a rural area of Mississippi, near the Yazoo River basin, which is ecologically sensitive. The HDD replacement project minimizes surface disruption, but the pipeline's proximity to waterways requires careful monitoring to prevent leaks and protect water quality. The region's clay soils and seasonal flooding pose additional considerations for pipeline integrity and cathodic protection systems.

Frequently asked questions

The Enbridge Yazo Kosc Line 26 HDD Replacement Project is located on Slack Road in Pickens, Holmes County, Mississippi, United States, with coordinates 32.929111, -90.086917.

This project involves the replacement of a section of gas pipeline using horizontal directional drilling (HDD) to minimize environmental impact. It is part of Enbridge's pipeline infrastructure for transporting natural gas.

Gas pipelines in the United States are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under the Department of Transportation, specifically 49 CFR Part 192 for gas pipelines.

Horizontal directional drilling (HDD) is a trenchless method used to install pipelines underground with minimal surface disturbance. It is often used to cross under waterways, roads, or sensitive environments.

Gas pipelines in Mississippi must consider proximity to waterways like the Yazoo River, soil erosion, and flood risks. Operators implement cathodic protection and leak detection systems to ensure safety and environmental protection.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector