Risk: Medium Gas Pipeline Operational

ET Gathering & Processing LLC - E. Union City Gas Pipeline, Clarksville, Arkansas

CLARKSVILLE, Arkansas, United States

Overview

ET Gathering & Processing LLC - E. Union City is an operational gas pipeline facility located 2 miles SW of Clarksville, Arkansas, USA. It operates under NAICS code 486210 for pipeline transportation of natural gas.

ET Gathering & Processing LLC - E. Union City is a gas pipeline facility situated in Johnson County, Arkansas, approximately 2 miles southwest of Clarksville. The facility is operational and classified under NAICS 486210, which covers pipeline transportation of natural gas. As part of the extensive U.S. natural gas pipeline network, it contributes to the movement of gas from production areas to distribution systems. The facility operates under the regulatory oversight of the Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with 49 CFR Part 192, which governs gas pipeline safety. This includes requirements for pipeline design, construction, testing, and maintenance, as well as integrity management programs to prevent leaks and ruptures. The facility's location in Arkansas places it within a region with significant natural gas production and infrastructure. Environmental considerations for this facility include its proximity to rural areas and potential impact on local waterways. Pipeline operators are required to implement cathodic protection systems to prevent corrosion and conduct regular inspections. The facility plays a role in the regional energy supply chain, supporting natural gas distribution for residential, commercial, and industrial use in the area.

Environmental context

The facility is located in a rural area of Johnson County, Arkansas, near the Arkansas River watershed. Pipeline infrastructure in this region must manage risks related to soil erosion, waterway crossings, and potential leaks that could affect local ecosystems. Operators are required to implement corrosion prevention measures and emergency response plans to mitigate environmental impacts.

Frequently asked questions

The facility is located 2 miles southwest of Clarksville, in Johnson County, Arkansas, USA.

It is a natural gas pipeline facility classified under NAICS 486210 for pipeline transportation of natural gas.

Gas pipelines in the U.S. are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under 49 CFR Part 192.

Operators must implement integrity management programs, cathodic protection to prevent corrosion, and regular inspections to ensure pipeline safety.

The facility gathers and processes natural gas, transporting it from production areas to distribution networks for end users.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector