Gas Pipeline Operational

Fitchburg Gas & Electric LNG Plant - Westminster, Massachusetts Gas Pipeline Facility

WESTMINSTER, Massachusetts, United States

Overview

Fitchburg Gas & Electric LNG Plant in Westminster, Massachusetts, is an operational gas pipeline facility serving the region's natural gas infrastructure.

The Fitchburg Gas & Electric LNG Plant is a liquefied natural gas facility located in Westminster, Worcester County, Massachusetts, United States. It operates as part of the broader gas pipeline infrastructure, supporting peak demand and supply reliability for the local grid. The facility is situated at Livermore Hill Rd and is classified under NAICS code 486210 for pipeline transportation of natural gas. As a liquefied natural gas plant, it plays a critical role in storing and vaporizing LNG to meet seasonal demand fluctuations. The facility operates under the regulatory oversight of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with 49 CFR Part 192 for gas pipeline safety. Its location in central Massachusetts positions it within a region with moderate population density and proximity to major natural gas transmission corridors. The environmental context includes its location in a rural area near the Wachusett Reservoir watershed, requiring careful management of potential impacts on local water resources. The facility's operational status ensures continued support for natural gas distribution in the region, contributing to energy security for residential and commercial customers in the Fitchburg area.

Environmental context

The facility is located in a rural area of Westminster, Massachusetts, near the Wachusett Reservoir watershed, which supplies drinking water to the Boston area. Proximity to this sensitive water resource necessitates robust spill prevention and cathodic protection measures to prevent corrosion-related leaks. The plant's LNG storage and vaporization operations involve cryogenic temperatures and require careful management of boil-off gas to minimize emissions.

Frequently asked questions

The Fitchburg Gas & Electric LNG Plant is located on Livermore Hill Rd in Westminster, Worcester County, Massachusetts, United States.

The facility is a liquefied natural gas (LNG) plant that stores and vaporizes LNG to meet peak demand for natural gas in the Fitchburg area, supporting the regional gas pipeline infrastructure.

LNG plants in the U.S. are regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under 49 CFR Part 193 for LNG facilities, along with state and local safety codes.

The plant operates under PHMSA regulations requiring leak detection, cathodic protection, and emergency response plans. Its location near the Wachusett Reservoir necessitates additional measures to protect water quality.

The plant provides critical peak-shaving capacity for the natural gas grid, ensuring reliable supply during high-demand periods and supporting energy security for the region.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector