Risk: Low Gas Pipeline Operational

Okolona Pig Receiver - Gas Pipeline Facility in Okolona, Arkansas, United States

OKOLONA, Arkansas, United States

Overview

The Okolona Pig Receiver is a gas pipeline facility in Okolona, Arkansas, United States. It operates under PHMSA and DOT 49 CFR Part 192 regulations for natural gas pipeline safety.

The Okolona Pig Receiver is a gas pipeline facility located in Okolona, Arkansas, United States. It serves as a pig receiver, a component used for launching and receiving pipeline inspection gauges (pigs) to maintain pipeline integrity. The facility is situated in Clark County and is part of the extensive natural gas pipeline network in the region. As a gas pipeline asset, the Okolona Pig Receiver operates under the regulatory framework of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Department of Transportation (DOT) 49 CFR Part 192, which governs the safe transportation of natural gas. The facility's NAICS code 486210 indicates it is involved in pipeline transportation of natural gas. Typical pig receivers are designed to handle standard pipeline pressures and are equipped with launcher/receiver mechanisms. The Okolona Pig Receiver plays a critical role in the operational integrity of the natural gas pipeline system. By enabling the insertion and retrieval of pigs, the facility supports routine cleaning, inspection, and maintenance activities that help prevent corrosion and blockages. This contributes to the safe and efficient delivery of natural gas to end-users in the region.

Environmental context

The facility is located in a rural area of Clark County, Arkansas, near the intersection of Bunn Road and Route 51. The surrounding environment includes agricultural land and scattered woodlands. Pipeline pig receivers like this one are typically designed with containment measures to prevent gas releases during pigging operations. The proximity to local waterways and populated areas is a consideration for environmental risk management, though the facility's operational status suggests adherence to standard safety protocols.

Frequently asked questions

The Okolona Pig Receiver is located at the intersection of Bunn Road and Route 51 in Okolona, Arkansas, United States, in Clark County.

A pig receiver is used to launch and receive pipeline inspection gauges (pigs) that clean, inspect, and maintain the interior of gas pipelines, ensuring operational integrity and safety.

The facility operates under the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and DOT 49 CFR Part 192, which sets safety standards for natural gas pipelines.

The NAICS code for the Okolona Pig Receiver is 486210, which corresponds to pipeline transportation of natural gas.

By enabling pigging operations, the facility helps detect corrosion, blockages, and other defects, allowing for timely maintenance and reducing the risk of leaks or failures.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector