Overview
ROVER PIPELINE - MAINLINE CS2 is a gas pipeline compressor station in Wooster, Ohio, United States. It is part of the Rover Pipeline system, a major natural gas transmission infrastructure.
ROVER PIPELINE - MAINLINE CS2 (0285032017) is a compressor station located in Wooster, Wayne County, Ohio, United States. It is a component of the Rover Pipeline, a large-scale natural gas transmission system that transports gas from the Marcellus and Utica shale regions to markets in the Midwest and Canada. The facility is operational and classified under NAICS 486210 for pipeline transportation of natural gas. The Rover Pipeline operates under the regulatory oversight of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and complies with 49 CFR Part 192 for gas pipeline safety. Compressor stations like CS2 are critical for maintaining pressure and flow along the pipeline, typically featuring gas-fired turbines or electric motors. The facility's location in Ohio places it within a region with extensive pipeline infrastructure supporting the energy needs of the eastern United States. As part of the Rover Pipeline system, this compressor station contributes to the reliable delivery of natural gas to residential, commercial, and industrial consumers. The pipeline network plays a key role in energy security and economic activity in the region. Environmental considerations include proximity to agricultural areas and waterways, with standard safety measures such as cathodic protection and regular inspections to minimize risks.
Environmental context
The compressor station is situated in a rural area near Wooster, Ohio, surrounded by agricultural land and small waterways. The Rover Pipeline crosses several rivers and streams, requiring careful management to prevent erosion and protect water quality. Standard environmental practices include leak detection systems, corrosion control, and adherence to PHMSA regulations to minimize impact on local ecosystems and communities.
Frequently asked questions
ROVER PIPELINE - MAINLINE CS2 is located at 0.5 miles north of West Lincoln Way on South Elyria Road in Wooster, Wayne County, Ohio, United States.
It is a compressor station on the Rover Pipeline system, which compresses natural gas to maintain flow and pressure for long-distance transmission from the Marcellus and Utica shale regions to markets in the Midwest and Canada.
The NAICS code for this facility is 486210, which covers pipeline transportation of natural gas.
Gas pipeline compressor stations in the U.S. are regulated by PHMSA under 49 CFR Part 192, which covers design, construction, operation, and maintenance safety standards for natural gas pipelines.
Typical safety measures include cathodic protection to prevent corrosion, leak detection systems, emergency shutdown procedures, regular inspections, and compliance with PHMSA integrity management requirements.
Other Gas Pipeline plants in United States · 6 nearby