Risk: Medium Gas Pipeline Operational

SIMCOE - MIERA CENTRAL DELIVERY POINT Gas Pipeline Facility in La Plata County, Colorado

LA PLATA COUNTY, Colorado, United States

Overview

SIMCOE - MIERA CENTRAL DELIVERY POINT is an operational gas pipeline facility in La Plata County, Colorado, United States. It operates under PHMSA and DOT 49 CFR Part 192 regulations.

SIMCOE - MIERA CENTRAL DELIVERY POINT is a gas pipeline facility located in La Plata County, Colorado, United States. The facility is operational and serves as a central delivery point for natural gas transmission in the region. Its location in the southwestern part of the state places it within a network that supports energy distribution across the Rocky Mountain area. The facility operates under the regulatory framework of the U.S. Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Department of Transportation (DOT) 49 CFR Part 192, which governs gas pipeline safety. As a delivery point, it likely connects to gathering lines and transmission pipelines, playing a role in the midstream sector. The specific NAICS code 486210 indicates it is classified as a pipeline transportation of natural gas facility. This facility contributes to the natural gas infrastructure in Colorado, a state with significant energy production. Its operational status ensures continued service for local and regional energy needs. The pipeline network in this area supports both residential and industrial consumers, highlighting its importance in the broader energy grid.

Environmental context

The facility is situated in La Plata County, Colorado, an area characterized by mountainous terrain and proximity to the San Juan National Forest. Pipeline operations in such regions require careful management to prevent leaks or ruptures that could impact water sources and wildlife habitats. Cathodic protection systems are typically employed to mitigate corrosion risks, and regular inspections are mandated under PHMSA regulations to ensure environmental safety.

Frequently asked questions

SIMCOE - MIERA CENTRAL DELIVERY POINT is located in La Plata County, Colorado, United States, at SEC 8, T34N, R8W.

It is a gas pipeline central delivery point that facilitates the transmission of natural gas within the pipeline network in Colorado.

The facility operates under U.S. PHMSA and DOT 49 CFR Part 192 regulations, which set safety standards for gas pipelines.

The NAICS code is 486210, which corresponds to Pipeline Transportation of Natural Gas.

It serves as a delivery point in the natural gas transmission network, supporting energy distribution to residential and industrial consumers in the region.

Other Gas Pipeline plants in United States · 6 nearby

UtilityRadar
More
Press Esc to close · Browse by sector