Overview
Mid Valley Pipeline Company, Mayersville Station is an operational oil pipeline facility in Issaquena County, Mississippi. It serves as a key node in the regional petroleum transport network.
Mid Valley Pipeline Company, Mayersville Station is an oil pipeline facility located 1.5 miles south of Mayersville, Mississippi, along Highway 1. The facility operates within the United States' extensive pipeline infrastructure, which is regulated by the Pipeline and Hazardous Materials Safety Administration (PHMSA) under 49 CFR Part 195 for hazardous liquid pipelines. As part of the Mid Valley Pipeline system, this station plays a role in transporting crude oil or refined products across the region. The facility operates under NAICS code 486110, which covers pipeline transportation of crude oil. Typical oil pipeline stations in this region include pump stations, storage tanks, and metering equipment to ensure safe and efficient flow. The regulatory framework requires compliance with integrity management programs, leak detection systems, and regular inspections to mitigate risks. Located in the Mississippi Delta, the station is situated near agricultural and wetland areas. Its operational significance lies in connecting Gulf Coast refineries with inland markets, supporting the regional energy supply chain. The facility's proximity to the Mississippi River and local waterways necessitates robust environmental safeguards to prevent spills and protect aquatic ecosystems.
Environmental context
The facility is located in the Mississippi Delta, a region characterized by fertile agricultural land and extensive river systems, including the nearby Mississippi River. Oil pipeline operations in this area must address risks related to soil and water contamination from potential leaks or spills. The station's proximity to waterways and floodplains requires adherence to PHMSA regulations for spill prevention and response, as well as coordination with local emergency management agencies.
Frequently asked questions
The station is located 1.5 miles south of Mayersville, Mississippi, on Highway 1, in Issaquena County.
It is an oil pipeline facility, part of the Mid Valley Pipeline system, regulated under PHMSA for hazardous liquid transport.
The operator is Mid Valley Pipeline Company, though specific ownership details are not publicly listed.
The facility must comply with PHMSA's 49 CFR Part 195, covering design, construction, operation, and maintenance of hazardous liquid pipelines.
Located near the Mississippi River, the station requires robust spill prevention and response plans to protect local waterways and ecosystems.
Other Oil Pipeline plants in United States · 6 nearby