Overview
PLANTATION PIPE LINE CO. - AUSTELL TERMINAL is a refined product pipeline terminal in Lithia Springs, Georgia, United States. It operates under US PHMSA and DOT regulations for hazardous liquid pipelines.
PLANTATION PIPE LINE CO. - AUSTELL TERMINAL is a refined product pipeline terminal located at 3530 North County Line Church in Lithia Springs, Georgia, within Douglas County. As part of the Plantation Pipe Line system, it handles the transportation of refined petroleum products such as gasoline, diesel, and jet fuel. The facility is operational and classified under NAICS code 486910 for pipeline transportation of refined petroleum products. The terminal operates under the regulatory oversight of the US Pipeline and Hazardous Materials Safety Administration (PHMSA) and the Department of Transportation (DOT), specifically 49 CFR Part 195 for hazardous liquid pipelines. These regulations mandate rigorous safety standards including cathodic protection, leak detection, and integrity management programs. The facility's location near Atlanta's metropolitan area places it within a key distribution corridor for the southeastern United States. This terminal plays a critical role in the regional fuel supply chain, serving as a storage and distribution hub for refined products. Its proximity to major highways and the Atlanta metropolitan area ensures efficient delivery to end-users. The facility's operational status contributes to the energy infrastructure of Georgia, supporting both residential and commercial fuel demands.
Environmental context
The terminal is situated in a suburban area near Lithia Springs, with proximity to the Chattahoochee River watershed. Pipeline infrastructure in this region must address potential risks to waterways and populated areas. The facility's age and cathodic protection systems are key factors in preventing corrosion-related leaks. The commodity transported (refined products) poses spill risks that require robust containment and emergency response plans.
Frequently asked questions
The terminal is located at 3530 North County Line Church, Lithia Springs, Georgia 30122-2274, in Douglas County, United States.
It is a refined product pipeline terminal that handles the storage and distribution of petroleum products such as gasoline, diesel, and jet fuel.
The terminal operates under US PHMSA and DOT regulations, specifically 49 CFR Part 195 for hazardous liquid pipelines, which mandate safety and integrity management.
The NAICS code is 486910, which covers pipeline transportation of refined petroleum products.
It serves as a distribution hub for the Atlanta metropolitan area and southeastern US, ensuring reliable delivery of refined products to consumers and businesses.
Other Refined Product Pipeline plants in United States · 6 nearby