Biomass Power Plant Operational

Waste Incinerator #1 - 11.6 MW Biomass Power Plant in Leverkusen, Germany

Germany
Visit official website

Overview

Waste Incinerator #1 is an 11.6 MW biomass power plant in Leverkusen, Germany, operated by AVEA Entsorgungsbetriebe GmbH & Co. KG. It converts waste into energy, supporting local grid stability.

Waste Incinerator #1 is a biomass power plant located in Leverkusen, Germany, with a capacity of 11.6 MW. Operated by AVEA Entsorgungsbetriebe GmbH & Co. KG, the facility processes waste to generate electricity, contributing to the region's energy mix. As a waste-to-energy plant, it plays a role in reducing landfill dependency while providing a renewable energy source. The plant operates under the EU Industrial Emissions Directive (2010/75/EU), which sets strict emission limits for waste incineration. Best Available Techniques (BAT) are applied to control pollutants such as dioxins, heavy metals, and acid gases. The 11.6 MW capacity places it in the small-scale category for biomass power plants in Germany, where many facilities range from 5 to 50 MW. Environmentally, the plant helps divert waste from landfills and reduces methane emissions. Its location in an industrial area near Leverkusen minimizes impact on populated zones. The facility supports Germany's Energiewende by providing baseload renewable power, complementing intermittent sources like wind and solar.

Environmental context

The plant's waste-to-energy process reduces landfill use and associated methane emissions. Located in an industrial area of Leverkusen, it operates under strict EU emission standards, minimizing local air quality impacts. The 11.6 MW capacity reflects a moderate scale, with continuous emission monitoring to comply with BAT limits for dioxins, NOx, and particulate matter.

Frequently asked questions

Waste Incinerator #1 is located in Leverkusen, Germany, at coordinates 51.0167 N, 6.9833 E.

The plant uses waste as its primary fuel, converting it into electricity through incineration.

The plant is owned and operated by AVEA Entsorgungsbetriebe GmbH & Co. KG.

Waste incineration plants in Germany must comply with the EU Industrial Emissions Directive (2010/75/EU) and the German Federal Immission Control Act (BImSchG), which set strict emission limits for pollutants like dioxins, NOx, and particulate matter.

By converting waste into electricity, the plant reduces landfill use and generates renewable energy, supporting Germany's energy transition targets.
UtilityRadar
More
Press Esc to close · Browse by sector