Biomass Power Plant Operational

Sermonde (Aterro Sanitário) - 4.5 MW Biomass Power Plant in Portugal

Portugal
Visit official website

Overview

Sermonde (Aterro Sanitário) is a 4.5 MW biomass power plant in Portugal, fueled by waste. It is operational and contributes to the country's renewable energy portfolio.

Sermonde (Aterro Sanitário) is a biomass power plant located in Portugal, with a capacity of 4.5 MW. The facility uses waste as its primary fuel, aligning with Portugal's strategy to diversify renewable energy sources and manage waste sustainably. As a small-scale biomass plant, it plays a role in the local energy grid. The plant operates under Portugal's national regulations, which transpose the EU Industrial Emissions Directive (2010/75/EU). This framework sets emission limits for pollutants such as SOx, NOx, and particulate matter, and requires the use of Best Available Techniques (BAT) for waste-to-energy facilities. The plant's capacity is modest compared to larger biomass or thermal plants, but it represents a niche in the sector. By converting waste into electricity, the plant reduces landfill volumes and provides a local source of renewable energy. Its location in Portugal benefits from the country's growing focus on renewable energy, which includes biomass, wind, and solar. The facility supports regional waste management goals and contributes to the circular economy.

Environmental context

The plant's use of waste as fuel reduces methane emissions from landfills and provides a renewable energy source. However, biomass combustion can emit CO2, SOx, and NOx, though modern plants employ emission controls. Proximity to populated areas may raise air quality concerns, but Portugal's adherence to EU emission standards mitigates risks. The small capacity limits overall environmental impact.

Frequently asked questions

Sermonde (Aterro Sanitário) is located in Portugal, near the coordinates 41.0461 N, -8.5913 W.

It is a biomass power plant that uses waste as its primary fuel to generate electricity.

The plant has a capacity of 4.5 megawatts (MW), making it a small-scale power generation facility.

Biomass plants in Portugal must comply with the EU Industrial Emissions Directive (2010/75/EU), which sets emission limits for pollutants and requires Best Available Techniques (BAT) for waste-to-energy operations.

By using waste as fuel, the plant reduces landfill volumes and generates renewable energy, supporting Portugal's circular economy and waste management goals.
UtilityRadar
More
Press Esc to close · Browse by sector