Biomass Power Plant Operational

FUENTE ALAMO III Biomass Power Plant, Spain | 75 MW Waste-to-Energy Facility

Spain
Visit official website

Overview

FUENTE ALAMO III is a 75 MW biomass power plant in Spain, operational and owned by CARDENAL BELLUGA S.L. It converts waste into electricity, supporting renewable energy goals.

FUENTE ALAMO III is a biomass power plant located in Spain, with coordinates 37.700000, -1.100000. It is operational and has a capacity of 75 MW, placing it in the medium-scale range for biomass facilities in the country. The plant is owned by CARDENAL BELLUGA S.L. and utilizes waste as its primary fuel, contributing to Spain's renewable energy portfolio. The plant operates under Spain's national regulations, which align with the European Union's Industrial Emissions Directive (2010/75/EU). This directive sets emission limits and requires the use of Best Available Techniques (BAT) for waste-to-energy facilities. As a biomass plant, it benefits from Spain's supportive framework for renewable energy, including feed-in tariffs and sustainability criteria. FUENTE ALAMO III plays a role in local waste management by converting waste into energy, reducing landfill use and greenhouse gas emissions. Its location in southeastern Spain supports regional energy diversification and grid stability. The plant's operation aligns with Spain's commitment to increasing renewable energy capacity and reducing carbon emissions.

Environmental context

The plant's use of waste as fuel reduces methane emissions from landfills and provides a renewable energy source. However, biomass combustion emits CO2, SOx, and NOx, though at lower levels than fossil fuels. Proximity to populated areas may raise air quality concerns, but compliance with EU emission standards mitigates risks. The plant's capacity of 75 MW is moderate, balancing environmental benefits with local impacts.

Frequently asked questions

FUENTE ALAMO III is located in Spain, with approximate coordinates 37.700000, -1.100000.

FUENTE ALAMO III is a biomass power plant that uses waste as its primary fuel to generate electricity.

The plant has a capacity of 75 megawatts (MW), making it a medium-scale biomass facility.

Biomass plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU), which sets emission limits and requires Best Available Techniques (BAT) for waste-to-energy operations.

By converting waste into electricity, the plant supports Spain's renewable energy targets and reduces reliance on fossil fuels, aligning with national climate and energy plans.