Overview
Ardwick Railway Goods Yard Incinerator, also known as Newhaven EFW Plant, is a 33.5 MW biomass power plant in the United Kingdom. It is owned by Associated Energy Projects plc and is currently operational.
Ardwick Railway Goods Yard Incinerator, also known as Newhaven EFW Plant, is a biomass power plant located in the United Kingdom. With a capacity of 33.5 MW, it operates within the small-to-medium scale range for the sector. The facility is owned by Associated Energy Projects plc and is currently operational, converting waste into energy. The plant uses waste as its primary fuel, a common practice in the UK's energy-from-waste (EfW) sector. It operates under the EU Industrial Emissions Directive 2010/75/EU, which sets stringent emission limits for waste incineration. Best Available Techniques (BAT) are applied to control pollutants such as dioxins, heavy metals, and acid gases. The UK's regulatory framework ensures compliance with environmental standards. This facility contributes to the UK's waste management and renewable energy goals by diverting waste from landfills and generating electricity. Its location in an urban area underscores the importance of emission controls to protect public health. The plant supports local grid stability and reduces reliance on fossil fuels.
Environmental context
The plant's use of waste as fuel reduces landfill methane emissions but requires careful management of air pollutants like NOx, SOx, and particulates. Its urban location necessitates stringent emission controls under the Industrial Emissions Directive. The 33.5 MW capacity indicates a moderate environmental footprint, with CO2 emissions partially offset by avoided landfill emissions.
Frequently asked questions
The plant is located in the United Kingdom, with coordinates 53.474000, -2.207900.
The plant uses waste as its primary fuel, making it an energy-from-waste facility.
The plant is owned by Associated Energy Projects plc.
The plant operates under the EU Industrial Emissions Directive 2010/75/EU, which sets emission limits for waste incineration, and must apply Best Available Techniques.
The plant has a capacity of 33.5 MW, placing it in the small-to-medium scale range for biomass power plants.