Biomass Power Plant Operational

Bellhouse Pit Landfill Scheme - UK Biomass Power Plant (2.7 MW)

United Kingdom
Visit official website

Overview

Bellhouse Pit Landfill Scheme is a 2.7 MW biomass power plant in the United Kingdom, operated by Ex Waste Ltd/Combined Landfill Projects Ltd. It converts landfill gas into electricity.

Bellhouse Pit Landfill Scheme is a biomass power plant located in the United Kingdom, with a capacity of 2.7 MW. The facility is owned by Ex Waste Ltd and Combined Landfill Projects Ltd, and it is currently operational. As a landfill gas-to-energy project, it contributes to the UK's renewable energy portfolio. The plant uses waste as its primary fuel, specifically landfill gas, which is captured from the Bellhouse Pit landfill site. This technology helps mitigate methane emissions while generating electricity. The UK's power generation sector is regulated under the EU Industrial Emissions Directive and national standards, with incentives for renewable energy through schemes like the Renewables Obligation. By converting landfill gas into electricity, the facility reduces greenhouse gas emissions and provides a local source of renewable energy. Its small scale (2.7 MW) is typical for landfill gas projects, which often serve local grids or offset on-site consumption. The plant supports the UK's transition to a low-carbon energy system.

Environmental context

The plant's use of landfill gas as fuel reduces methane emissions, a potent greenhouse gas, while generating electricity. Located in a rural area, its emissions are relatively low compared to fossil fuel plants. The facility aligns with UK waste management and renewable energy policies, contributing to local air quality improvements by capturing gas that would otherwise be released.

Frequently asked questions

Bellhouse Pit Landfill Scheme is located in the United Kingdom, near Colchester, Essex. The facility is situated at the Bellhouse Pit landfill site.

It is a biomass power plant that uses landfill gas as fuel to generate electricity. The plant has a capacity of 2.7 MW.

The facility is owned by Ex Waste Ltd and Combined Landfill Projects Ltd (CLP). The plant is currently operational.

Biomass power plants in the UK must comply with the EU Industrial Emissions Directive (2010/75/EU) and national emissions standards. They may also participate in renewable energy support schemes like the Renewables Obligation.

By capturing and combusting landfill gas, the plant reduces methane emissions and generates renewable electricity, supporting the UK's climate goals and improving local air quality.
UtilityRadar
More
Press Esc to close · Browse by sector