Biomass Power Plant Operational

Farington Waste Recovery Park (Waste AD) - Biomass Power Plant in Lancashire, UK

United Kingdom
Visit official website

Overview

Farington Waste Recovery Park (Waste AD) is a 1.9 MW biomass power plant in Lancashire, United Kingdom, operated by Global Renewables Lancashire Ltd. It converts waste into renewable energy.

Farington Waste Recovery Park (Waste AD) is a biomass power plant located in Lancashire, United Kingdom, with a capacity of 1.9 MW. The facility is owned and operated by Global Renewables Lancashire Ltd and is currently operational. It utilizes anaerobic digestion (AD) technology to process waste and generate electricity, contributing to the region's renewable energy portfolio. The plant operates under the regulatory framework of the United Kingdom, which includes the Environmental Permitting Regulations and the Renewable Obligation scheme. As a small-scale biomass facility, it aligns with the UK's strategy to divert waste from landfills and reduce greenhouse gas emissions. The technology employed is typical for waste-to-energy plants of this size, focusing on efficient energy recovery from organic waste. Environmentally, the plant plays a role in managing local waste while generating low-carbon electricity. Its capacity is modest compared to larger power stations, but it supports local grid stability and reduces reliance on fossil fuels. The facility's location in Lancashire allows it to serve the surrounding community by processing municipal and commercial waste, thereby contributing to circular economy goals.

Environmental context

The plant's biomass fuel source, derived from waste, helps reduce methane emissions from landfills and provides a renewable energy alternative. Its small capacity (1.9 MW) limits its overall environmental footprint, but it still contributes to local air quality considerations typical of combustion processes. The facility is subject to UK emissions standards, including limits on NOx and particulates, ensuring compliance with environmental regulations.

Frequently asked questions

Farington Waste Recovery Park is located in Lancashire, United Kingdom, near the town of Farington.

It is a biomass power plant that uses anaerobic digestion (AD) technology to convert waste into electricity.

The plant has a capacity of 1.9 megawatts (MW), making it a small-scale renewable energy facility.

The plant is owned and operated by Global Renewables Lancashire Ltd.

Biomass plants in the UK must comply with the Environmental Permitting Regulations and emissions limits for pollutants such as NOx and particulates, as well as sustainability criteria for fuel sourcing.
UtilityRadar
More
Press Esc to close · Browse by sector