Biomass Power Plant Operational

Haverton Hill Incinerator: 20.1 MW Biomass Power Plant in the United Kingdom

United Kingdom
Visit official website

Overview

Haverton Hill Incinerator is a 20.1 MW biomass power plant in the United Kingdom, operated by Cleveland Waste Management Ltd. It converts waste into energy, contributing to the UK's renewable energy mix.

Haverton Hill Incinerator is a biomass power plant located in Haverton Hill, United Kingdom, with a capacity of 20.1 MW. Operated by Cleveland Waste Management Ltd, the facility is classified as a biomass power plant and uses waste as its primary fuel source. It is currently operational and plays a role in the UK's energy-from-waste sector. The plant operates under the regulatory framework of the UK, which implements the EU Industrial Emissions Directive 2010/75/EU and Best Available Techniques (BAT) conclusions for waste incineration. As a biomass facility using waste, it is subject to stringent emission limits for pollutants such as SOx, NOx, and particulate matter. The 20.1 MW capacity places it in the small-to-medium scale for power generation in the UK. Environmentally, the Haverton Hill Incinerator helps divert waste from landfills while generating electricity. Its location in an industrial area near the River Tees minimizes impact on populated areas. The facility's technology is typical for modern energy-from-waste plants, with flue gas treatment to control emissions. It contributes to local grid stability and supports the UK's renewable energy targets.

Environmental context

The Haverton Hill Incinerator uses waste as fuel, reducing landfill use and generating electricity. Its location in an industrial area near the River Tees limits proximity to dense populations. The plant's emissions are regulated under UK law, implementing EU standards for waste incineration. As a 20.1 MW facility, it has a moderate CO2 footprint relative to fossil fuel plants, but its waste-to-energy process avoids methane emissions from landfills.

Frequently asked questions

Haverton Hill Incinerator is located in Haverton Hill, United Kingdom, near the River Tees.

It is a biomass power plant that uses waste as fuel to generate electricity.

The plant has a capacity of 20.1 megawatts (MW).

UK waste-to-energy plants must comply with the Industrial Emissions Directive (IED) and Best Available Techniques (BAT) for waste incineration, setting limits on emissions like SOx, NOx, and dioxins.

It reduces landfill waste, generates renewable energy, and avoids methane emissions from waste decomposition, while being regulated to minimize air pollutants.
UtilityRadar
More
Press Esc to close · Browse by sector