Overview
Land at Lostock Works (Northwich Facility) is a 5 MW biomass power plant in the United Kingdom, owned by Orsted. It converts biomass into electricity, contributing to the UK's renewable energy mix.
Land at Lostock Works (Northwich Facility) is a biomass power plant located in Northwich, United Kingdom. With a capacity of 5 MW, it is a small-scale facility within the UK's power generation sector, owned by Orsted (formerly Dong Energy). The plant is operational and plays a role in the country's transition to renewable energy sources. The facility operates under the UK's regulatory framework, which includes the Renewable Obligation (RO) and Contracts for Difference (CfD) schemes that support biomass generation. Biomass power plants typically use organic materials like wood pellets or agricultural waste to produce electricity, and this plant's small capacity suggests it may serve local energy needs or provide distributed generation. As a biomass plant, it offers a renewable alternative to fossil fuels, though its environmental impact depends on fuel sourcing and combustion efficiency. The plant's location in Northwich, a town in Cheshire, means it contributes to local energy supply and supports the UK's net-zero emissions targets by displacing fossil fuel-based generation.
Environmental context
The plant uses biomass as fuel, which is considered renewable but can have varying carbon footprints depending on feedstock sourcing and lifecycle emissions. Located in Northwich, a town in Cheshire, the facility operates in a region with moderate population density, so emissions of particulates and NOx are managed under UK air quality regulations. The small 5 MW capacity limits its overall environmental footprint compared to larger power stations.
Frequently asked questions
The facility is located in Northwich, Cheshire, United Kingdom, at coordinates 53.263800, -2.482400.
It is a biomass power plant that generates electricity by burning organic materials such as wood pellets or agricultural waste.
The plant is owned by Orsted, formerly known as Dong Energy, a Danish energy company.
Biomass plants in the UK must comply with the Renewable Obligation (RO) and Contracts for Difference (CfD) schemes, as well as emissions limits under the Environmental Permitting Regulations.
A 5 MW plant is small-scale, typically serving local energy needs or providing distributed generation, whereas larger stations can exceed 100 MW and supply regional grids.