Overview
PG1-Coxhoe Waste Disposal Site is a 3.8 MW biomass power plant in County Durham, United Kingdom, operated by Durham County Waste Management Company. It converts waste into energy, supporting local renewable generation.
PG1-Coxhoe Waste Disposal Site is an operational biomass power plant located in County Durham, United Kingdom. With a capacity of 3.8 MW, it is a small-scale facility within the UK's renewable energy sector, converting waste into electricity. The plant operates under the UK's regulatory framework, including the Environmental Permitting Regulations and the Renewables Obligation, which incentivize waste-to-energy projects. Biomass power plants like this one typically use combustion or gasification technologies to generate electricity from organic waste materials. As a waste-to-energy facility, PG1-Coxhoe contributes to local waste management and renewable energy targets. Its location in County Durham supports the region's transition to low-carbon energy sources, providing grid-connected power while reducing landfill dependency.
Environmental context
The plant's use of waste as fuel reduces methane emissions from landfills and displaces fossil fuel-based electricity. However, biomass combustion releases CO2, SOx, and NOx, which are regulated under UK emissions standards. Proximity to populated areas may require adherence to air quality limits. The small capacity limits overall environmental impact.
Frequently asked questions
PG1-Coxhoe Waste Disposal Site is located in County Durham, United Kingdom, near the village of Coxhoe.
It is a biomass power plant that generates electricity by combusting waste materials.
The plant has a capacity of 3.8 megawatts (MW), making it a small-scale facility.
The plant is owned and operated by Durham County Waste Management Company.
Biomass plants in the UK must comply with the Environmental Permitting Regulations, including emissions limits for SOx, NOx, and particulates, and may participate in the Renewables Obligation scheme.