Overview
Portley Ford Landfill Site is a 1.8 MW biomass power plant in the United Kingdom, operational and owned by Biogeneration / Biffa. It generates electricity from waste fuel.
Portley Ford Landfill Site is a biomass power plant located in the United Kingdom, with a capacity of 1.8 MW. The facility is operational and owned by Biogeneration / Biffa, contributing to the country's renewable energy portfolio. The plant uses waste as its primary fuel, typical of landfill gas or waste-to-energy facilities. In the UK, such plants operate under the Environmental Permitting Regulations, which implement the EU Industrial Emissions Directive. Best Available Techniques (BAT) are applied to control emissions, including methane capture and combustion. This facility plays a role in managing local waste while generating electricity for the grid. Its small scale is suited for distributed generation, reducing transmission losses and supporting local energy needs. The plant's operation aligns with UK climate targets by diverting waste from landfills and producing low-carbon power.
Environmental context
The plant's use of waste fuel reduces methane emissions from landfills, a potent greenhouse gas. Its location in a rural area minimizes exposure to dense populations. The 1.8 MW capacity indicates a modest environmental footprint, with emissions controlled under UK regulations. Proximity to agricultural land may influence local air quality, but compliance with BAT ensures minimal impact.
Frequently asked questions
Portley Ford Landfill Site is located in the United Kingdom, at coordinates 52.387100, -1.033100.
It is a biomass power plant that generates electricity using waste as fuel.
The plant is owned by Biogeneration / Biffa.
Biomass plants in the UK must comply with the Environmental Permitting Regulations, which implement the EU Industrial Emissions Directive. Best Available Techniques are required to control emissions.
The plant has a capacity of 1.8 MW.