Biomass Power Plant Operational

Sefter Farm AD Plant (Farm AD) - 1 MW Biomass Power Plant in the United Kingdom

United Kingdom
Visit official website

Overview

Sefter Farm AD Plant (Farm AD) is a 1 MW biomass power plant in the United Kingdom, operated by Barfoots of Botley. It converts agricultural waste into renewable energy.

Sefter Farm AD Plant (Farm AD) is a biomass power plant located in the United Kingdom, with coordinates 50.789000, -0.737300. It is owned and operated by Barfoots of Botley and has an operational status. With a capacity of 1 MW, it is a small-scale facility within the UK's renewable energy sector. The plant uses anaerobic digestion technology to process agricultural waste, generating electricity. As a biomass facility, it operates under the UK's regulatory framework, including the Renewable Obligation and environmental permitting. The UK has a strong focus on reducing greenhouse gas emissions, and small-scale AD plants like this contribute to the country's renewable energy targets. This facility plays a role in managing agricultural waste locally while producing clean energy. It supports the UK's transition to a low-carbon economy and helps reduce reliance on fossil fuels. The plant's output is fed into the national grid, providing renewable electricity to the surrounding area.

Environmental context

The plant uses biomass, a renewable fuel, but combustion still emits CO2, though considered carbon-neutral if sourced sustainably. Its small capacity (1 MW) limits emissions. Located in a rural area, it has minimal impact on populated zones. The UK's strict environmental regulations, including emissions limits and waste management rules, ensure the plant operates with controlled environmental impact.

Frequently asked questions

Sefter Farm AD Plant is located in the United Kingdom, at coordinates 50.789000, -0.737300.

Sefter Farm AD Plant uses biomass as its primary fuel, specifically agricultural waste processed through anaerobic digestion.

Sefter Farm AD Plant is owned by Barfoots of Botley.

Biomass power plants in the UK must comply with the Renewable Obligation, environmental permitting, and emissions limits under the Environmental Permitting Regulations. They also follow sustainability criteria for biomass sourcing.

Sefter Farm AD Plant generates 1 MW of electricity from agricultural waste, supporting the UK's renewable energy targets and reducing greenhouse gas emissions compared to fossil fuels.
UtilityRadar
More
Press Esc to close · Browse by sector