Overview
ITPCL TPP is a 1,200 MW coal power plant located in India. It is an operational facility contributing to the country's power generation capacity.
ITPCL TPP is a coal-fired power plant with a capacity of 1,200 MW, located in India. The plant is operational and plays a role in meeting the region's electricity demand. As a coal-based facility, it is part of India's thermal power generation sector, which remains a significant component of the national energy mix. The plant operates under India's environmental regulations, including the Ministry of Environment, Forest and Climate Change (MoEFCC) standards for emissions and water use. Coal power plants in India typically use subcritical or supercritical technology; ITPCL TPP's specific technology is not detailed, but its capacity indicates a large-scale installation. The plant's location near the coast may influence its cooling water supply and logistics. ITPCL TPP contributes to grid stability and power supply in its region. Coal plants in India face challenges related to fuel supply, ash management, and emission control. The facility's operational status suggests it is actively generating electricity, supporting local industrial and residential needs.
Environmental context
The plant's coal combustion produces CO2, SOx, NOx, and particulate matter, contributing to local and regional air quality concerns. Its proximity to populated areas may increase exposure to emissions. Water usage for cooling and ash disposal are additional environmental considerations. India's regulatory framework mandates emission standards and environmental impact assessments for such facilities.
Frequently asked questions
ITPCL TPP is located in India, with coordinates approximately 11.5214° N, 79.7515° E.
ITPCL TPP has a capacity of 1,200 megawatts (MW), making it a large-scale coal power plant.
ITPCL TPP uses coal as its primary fuel, which is typical for thermal power plants in India.
Coal power plants in India must comply with emission standards set by the Ministry of Environment, Forest and Climate Change (MoEFCC), including limits on SOx, NOx, and particulate matter. They also require environmental impact assessments and consent to operate from state pollution control boards.
Yes, ITPCL TPP is listed as operational, indicating it is actively generating electricity.