Coal Power Plant Operational

EC Białystok Coal Power Plant, Poland | 198 MW Facility

Poland
Visit official website

Overview

EC Białystok is a 198 MW coal power plant in Poland, operated by ENEA Wytwarzanie S.A. It supplies electricity to the national grid under Polish and EU emissions regulations.

EC Białystok is a coal-fired power plant located in Białystok, Poland, with a capacity of 198 MW. It is owned and operated by ENEA Wytwarzanie S.A., a major Polish energy company. The plant plays a role in the regional power supply within the Polish energy system. The facility uses coal as its primary fuel and operates under the European Union's Industrial Emissions Directive (2010/75/EU), which sets emission limits for SOx, NOx, and particulates. Polish coal plants typically employ subcritical or supercritical technology; EC Białystok's capacity indicates a medium-scale installation. The plant must comply with Best Available Techniques (BAT) conclusions for large combustion plants. As a coal-fired generator, EC Białystok contributes to Poland's energy mix, which remains heavily reliant on coal. The plant's environmental footprint includes CO2 emissions and local air quality impacts. Its operation is subject to national emission standards and EU climate policies, influencing its long-term role in the energy transition.

Environmental context

The plant's coal combustion releases CO2, SOx, NOx, and particulate matter, affecting local air quality. Białystok's location in northeastern Poland means the plant operates in a region with moderate population density. Compliance with EU Industrial Emissions Directive and BAT conclusions is required to mitigate environmental impact. The facility's age and technology (likely subcritical) influence its efficiency and emission intensity.

Frequently asked questions

EC Białystok is located in Białystok, Poland, at coordinates 53.1486° N, 23.1689° E.

EC Białystok has a capacity of 198 megawatts (MW), making it a medium-scale coal power plant.

EC Białystok is owned and operated by ENEA Wytwarzanie S.A., a subsidiary of the ENEA Group, one of Poland's largest energy companies.

As a Polish coal plant, EC Białystok must comply with the EU Industrial Emissions Directive (2010/75/EU) and Best Available Techniques (BAT) conclusions for large combustion plants, setting limits on SOx, NOx, and dust emissions.

EC Białystok uses coal as its primary fuel, consistent with Poland's coal-dominated energy sector.
UtilityRadar
More
Press Esc to close · Browse by sector