Coal Power Plant Operational

La Robla Grupo 2 Coal Power Plant | León, Spain Power Generation Facility

Spain
Visit official website

Overview

La Robla Grupo 2 is a 619 MW coal-fired power plant in Spain, operated by Gas Natural Fenosa Generacion S.L.U. It is an operational facility contributing to the country's power generation mix.

La Robla Grupo 2 is a coal-fired power plant located in the province of León, Spain, with a capacity of 619 MW. The facility is owned and operated by Gas Natural Fenosa Generacion S.L.U. and is currently operational, playing a role in Spain's energy infrastructure. The plant operates under the regulatory framework of the European Union, including the Industrial Emissions Directive (2010/75/EU) and Best Available Techniques (BAT) conclusions for large combustion plants. As a coal-fired facility, it is subject to stringent emission limits for SOx, NOx, and particulate matter, and must comply with national transposition of EU directives. La Robla Grupo 2 contributes to the regional power grid, supplying electricity to the surrounding area. The plant's operation is significant in the context of Spain's energy transition, as coal-fired generation faces increasing regulatory pressure and competition from renewable sources. Its capacity of 619 MW places it in the medium-to-large scale for coal plants in Europe.

Environmental context

The plant's coal fuel source results in significant CO2, SOx, and NOx emissions compared to natural gas or renewable alternatives. Its location in a populated area of León province may raise local air quality concerns. Older coal plants typically have lower efficiency and higher emissions. Compliance with EU emission standards is mandatory, and the plant may be subject to the EU Emissions Trading System for carbon costs.

Frequently asked questions

La Robla Grupo 2 is located in the province of León, in the autonomous community of Castile and León, Spain.

La Robla Grupo 2 has a capacity of 619 megawatts (MW), making it a medium-to-large coal-fired power plant.

The plant is owned and operated by Gas Natural Fenosa Generacion S.L.U., a major Spanish energy company.

Coal power plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU), which sets emission limits for SOx, NOx, and dust, and requires the use of Best Available Techniques (BAT). They also participate in the EU Emissions Trading System (EU ETS) for carbon emissions.

Coal power has historically been a significant part of Spain's energy mix, but its share has declined due to EU climate policies, competition from renewables, and economic factors. Plants like La Robla Grupo 2 are subject to phase-out discussions and may face reduced operation hours.
UtilityRadar
More
Press Esc to close · Browse by sector