Coal Power Plant Operational

MEIRAMA GRUPO 1 Coal Power Plant in Spain | Capacity 557.2 MW

Spain
Visit official website

Overview

MEIRAMA GRUPO 1 is a 557.2 MW coal-fired power plant in Spain, operated by Gas Natural Fenosa Generacion S.L.U. It contributes to the country's thermal power generation capacity.

MEIRAMA GRUPO 1 is a coal-fired power plant located in Spain, with a capacity of 557.2 MW. The facility is owned and operated by Gas Natural Fenosa Generacion S.L.U., a major energy company in the region. As a coal power plant, it plays a role in Spain's energy mix, providing baseload power to the grid. The plant operates under Spain's national regulations, which align with the European Union's Industrial Emissions Directive (2010/75/EU). This directive sets emission limits for SOx, NOx, and particulate matter, requiring Best Available Techniques (BAT) for pollution control. The plant's capacity places it in the medium-to-large scale for coal plants in Europe. MEIRAMA GRUPO 1's environmental impact is influenced by its coal fuel source, which results in CO2, SOx, and NOx emissions. The plant's location in Spain subjects it to EU climate policies and carbon pricing mechanisms. Its operational status indicates ongoing contribution to the region's power supply, though coal plants face increasing regulatory pressure in Europe.

Environmental context

The plant's coal combustion generates CO2, SOx, and NOx emissions, contributing to local and regional air quality concerns. Proximity to populated areas may amplify health impacts. EU regulations, including the Industrial Emissions Directive, require emission control technologies such as flue gas desulfurization and selective catalytic reduction. The plant's age and technology (subcritical vs. Typical coal plants of this era have moderate efficiency.

Frequently asked questions

MEIRAMA GRUPO 1 is located in Spain, with coordinates 43.1685 N, -8.4111 W.

The plant has a capacity of 557.2 MW, making it a medium-to-large coal power plant in Spain.

The plant is owned and operated by Gas Natural Fenosa Generacion S.L.U., a Spanish energy company.

Coal plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU), which sets emission limits for SOx, NOx, and dust, and requires Best Available Techniques (BAT).

The plant uses coal as its primary fuel, which is typical for thermal power generation.
UtilityRadar
More
Press Esc to close · Browse by sector