Risk: Low Diesel Power Plant Operational

Castelo Branco Office Park Diesel Power Plant, Brazil

Brazil
Visit official website

Overview

Castelo Branco Office Park is a 2.025 MW diesel power plant located in Brazil. It operates on oil fuel and serves local energy needs.

Castelo Branco Office Park is a diesel power plant situated in Brazil, with a capacity of 2.025 MW. This facility operates on oil as its primary fuel and is classified as a small-scale power generation unit within the Brazilian energy sector. The plant operates under Brazil's national environmental regulations, which include emission standards for stationary sources. Diesel power plants of this size are typically used for backup or peak-load generation, and they must comply with local air quality requirements. As a small diesel facility, Castelo Branco Office Park contributes to grid stability and local energy supply. Its operational status is active, and it plays a role in supporting the regional power infrastructure.

Environmental context

The plant uses oil as fuel, which results in CO2, SOx, and NOx emissions. Its small capacity of 2.025 MW limits its overall environmental footprint compared to larger fossil fuel plants. Proximity to populated areas may influence local air quality impacts, but specific distances are not detailed.

Frequently asked questions

Castelo Branco Office Park is located in Brazil, with coordinates approximately 23.5066° S, 46.8666° W.

It is a diesel power plant that uses oil as its primary fuel.

The plant has a capacity of 2.025 MW.

Diesel power plants in Brazil must comply with national emission standards set by CONAMA (National Environment Council) and local environmental agencies.

Yes, the plant is listed as operational.
UtilityRadar
More
Press Esc to close · Browse by sector