Overview
JINAMAR 10 GAS 2 is a 234.46 MW diesel power plant in Jinamar, Spain, operated by UNION ELECTRICA DE CANARIAS GENERACION S.A.U. It runs on oil and is currently operational.
JINAMAR 10 GAS 2 is a diesel power plant located in Jinamar, Spain, with a capacity of 234.46 MW. The facility is owned and operated by UNION ELECTRICA DE CANARIAS GENERACION S.A.U. and is currently in operational status. As a diesel plant, it contributes to the power generation mix of the Canary Islands, where energy supply is often dependent on fossil fuels due to limited interconnection with the mainland. The plant operates under Spain's national energy regulations, which align with the European Union's Industrial Emissions Directive (2010/75/EU). This directive sets strict emission limits for SOx, NOx, and particulate matter, requiring the use of Best Available Techniques (BAT) to minimize environmental impact. Given its reliance on oil, the facility likely employs emission control technologies such as flue gas desulfurization or selective catalytic reduction to comply with these standards. JINAMAR 10 GAS 2 plays a key role in the local grid, providing baseload or peaking power depending on demand. Its location in the Canary Islands, a region with high renewable energy potential but also significant tourism-driven electricity demand, underscores its importance for energy security. The plant's operation is subject to ongoing regulatory oversight to balance economic efficiency with environmental protection.
Environmental context
The plant's use of oil as primary fuel results in higher CO2, SOx, and NOx emissions compared to natural gas or renewable sources. Its location in Jinamar, near populated areas, may raise local air quality concerns. The facility's age and technology (likely subcritical diesel engines) influence its efficiency and emission profile. Regulatory compliance under the EU Industrial Emissions Directive requires continuous monitoring and adherence to emission limit values.
Frequently asked questions
JINAMAR 10 GAS 2 is located in Jinamar, Spain, on the island of Gran Canaria in the Canary Islands.
The plant has a capacity of 234.46 megawatts (MW), making it a medium-to-large diesel power plant.
The plant is owned and operated by UNION ELECTRICA DE CANARIAS GENERACION S.A.U., a Spanish utility company.
Diesel power plants in Spain must comply with the EU Industrial Emissions Directive (2010/75/EU), which sets emission limits for SOx, NOx, and dust, and requires the use of Best Available Techniques (BAT).
The plant uses oil as its primary fuel, which is typical for diesel power plants.