Overview
CT 13 DE JULIO is a 26 MW gas-fired power plant in Córdoba, Argentina, operated by GECOR (Generadora Córdoba SA). It supplies electricity to the local grid.
CT 13 DE JULIO is a gas-fired power plant located in Córdoba, Argentina, with a capacity of 26 MW. The plant is owned and operated by GECOR (Generadora Córdoba SA) and is currently operational. It plays a role in meeting regional electricity demand. The plant operates on natural gas, a relatively cleaner fossil fuel compared to coal or oil. In Argentina, gas-fired power generation is a key component of the energy mix, supported by domestic natural gas reserves. The plant's capacity of 26 MW places it in the small-scale category for gas power plants, typically serving local or industrial needs. As a gas-fired facility, CT 13 DE JULIO contributes to grid stability in Córdoba. Its operation aligns with Argentina's energy transition goals, as gas-fired plants often serve as a bridge between coal and renewable sources. The plant's environmental impact is moderated by the use of natural gas, which produces lower CO2 and pollutant emissions per unit of electricity compared to other fossil fuels.
Environmental context
The plant's gas-fired technology results in lower CO2, SOx, and NOx emissions compared to coal or oil plants. Its location in Córdoba, a populated area, necessitates compliance with national emission standards. The 26 MW capacity indicates a relatively small footprint, but local air quality considerations remain relevant. Argentina's regulatory framework for power plants includes limits on emissions and efficiency requirements.
Frequently asked questions
CT 13 DE JULIO is located in Córdoba, Argentina, at coordinates -32.161300, -64.153700.
CT 13 DE JULIO is a gas-fired power plant with a capacity of 26 MW.
The plant is owned and operated by GECOR (Generadora Córdoba SA).
Gas power plants in Argentina must comply with national emission standards and energy regulations, including limits on air pollutants and efficiency requirements.
With a capacity of 26 MW, CT 13 DE JULIO provides electricity to the Córdoba region, supporting local demand and grid stability.