Gas Power Plant Operational

Talakanskaya GTES - Gas Power Plant in Russia | 48 MW Capacity

Russia
Visit official website

Overview

Talakanskaya GTES is a 48 MW gas-fired power plant in Russia, operated by OJSC Surgutneftegas. It supports regional energy needs with natural gas generation.

Talakanskaya GTES is a gas-fired power plant located in Russia, with a capacity of 48 MW. Operated by OJSC Surgutneftegas, the facility is currently operational and contributes to the local power grid. As a gas power plant, it represents a moderate scale within Russia's diverse energy mix. The plant uses natural gas as its primary fuel, a common choice for power generation in Russia due to abundant domestic gas reserves. Gas plants typically offer lower emissions compared to coal. The facility operates under Russian federal regulations, including emission standards and environmental oversight. Talakanskaya GTES plays a role in supplying electricity to the surrounding region, supporting industrial and residential demand. Its operation by Surgutneftegas, a major oil and gas company, aligns with the company's energy production activities. The plant's location in a remote area of Siberia underscores its importance for local energy security.

Environmental context

The plant's gas fuel source results in lower CO2, SOx, and NOx emissions per MWh compared to coal or oil plants. Its location in a sparsely populated region of Siberia reduces direct exposure to large population centers. However, gas extraction and transport can have environmental impacts. The plant's moderate capacity of 48 MW places it in a small-to-medium scale, limiting its overall environmental footprint.

Frequently asked questions

Talakanskaya GTES is located in Russia, with coordinates approximately 59.7931 N, 110.8726 E, in the Siberian region.

Talakanskaya GTES has a capacity of 48 megawatts (MW), making it a small-to-medium scale gas power plant.

The plant is operated by OJSC Surgutneftegas, a major Russian oil and gas company.

Gas power plants in Russia must comply with federal environmental laws, including emission limits for pollutants like NOx and SOx, and adhere to safety standards set by Rostekhnadzor.

With 48 MW capacity, Talakanskaya GTES is smaller than many combined-cycle gas turbine plants in Russia, which often exceed 100 MW. It serves a local or regional role.
UtilityRadar
More
Press Esc to close · Browse by sector